Search results for: mallard creek

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 75
  • Program Management Services for the Mallard Creek Basin and Mallard Creek WRF Improvements

    Type : Bid Notification

    Due : 14 Mar, 2019 (about 5 years ago)
    Posted : about 5 years ago
    Started : 27 Feb, 2019 (about 5 years ago)

    Solicitation Number FY19-RFQ-08 Department Charlotte Water Category Architecture, Engineering & Surveying Commodity Code(s) Attachments FY19-RFQ-08 Mallard Creek Program Manager RFQ FINAL.pdf Pre-Bid Date & Time Pre-Bid Location No pre-proposal meeting scheduled. Bid Due Date & Time 3/14/2019 2:00 PM Bid Opening Location See RFQ for detailed instructions to submit a proposal.

    From: Charlotte (City)

  • Mallard Creek NPW/PW System Rehabilitation (Re-bid)

    Type : Bid Notification

    Due : 17 Apr, 2023 (11 months ago)
    Posted : 12 months ago
    Started : 13 Mar, 2023 (12 months ago)

    Description:SITE VISIT DATE/TIME: April 11, 2023 – 2PM (Local Time) SITE VISIT LOCATION: Mallard Creek Wastewater Treatment Plant – Conference Room 12400 US-29, Charlotte, NC 28262 SITE VISIT INSTRUCTIONS: Parking is available in the trailer section of the parking lot, located to the left of the plant. All entrants must check-in with Security Guard and present identification.

    From: Charlotte (City)

  • W. Mallard Creek Church Road Shared Use Path (Re-Advertisement)

    Type : Bid Notification

    Due : 08 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 24 Jan, 2022 (about 2 years ago)

    job_id=17086&view=vp The West Mallard Creek Church Road Multi‐Use Path is a 0.75 mile bicycle and pedestrian concrete path on West Mallard Creek Church Road between West Mallard Creek Road and Claude Freeman Drive.

    From: Charlotte (City)

  • Sitework Advertisement for the Mallard Creek WRF RUVI

    Type : Bid Notification

    Due : 29 Oct, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 14 Oct, 2019 (about 4 years ago)

    The Project includes the following Work: Construction of final clarification, filtration, and UV disinfection improvements at the Mallard Creek Water Reclamation Facility, including the following: • Demolition of existing clarifier mechanisms in Final Clarifiers No. 1, 2, & 3. • Concrete repair and installation of new clarifier mechanisms in Final Clarifiers No. 1, 2, & 3. • Demolition and installation of new piping and pumps in RAS/WAS Pumping Stations

    From: Charlotte (City)

  • Electrical Advertisement for the Mallard Creek WRF RUVI

    Type : Bid Notification

    Due : 29 Oct, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 14 Oct, 2019 (about 4 years ago)

    The Project includes the following Work: Construction of final clarification, filtration, and UV disinfection improvements at the Mallard Creek Water Reclamation Facility, including the following: • Demolition of existing clarifier mechanisms in Final Clarifiers No. 1, 2, & 3. • Concrete repair and installation of new clarifier mechanisms in Final Clarifiers No. 1, 2, & 3. • Demolition and installation of new piping and pumps in RAS/WAS Pumping Stations

    From: Charlotte (City)

  • Charlotte NC/ W. Mallard Creek Church Rd Shared Use Path

    Type : Bid Notification

    Due : 08 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 11 Jan, 2022 (about 2 years ago)

    Mallard Creek Church Rd Shared Use Path (512-16-005) The West Mallard Creek Church Road Multi-Use Path is a 0.75 mile bicycle and pedestrian concrete path on West Mallard Creek Church Road between West Mallard Creek Road and Claude Freeman Drive.

    From: The Institute Economic Development (State)

  • Progressive Design-Build Services for Mallard Creek Interceptor Improvement Project - Phase 1 and Phase 2

    Type : Bid Notification

    Due : 15 Jun, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 31 May, 2021 (about 2 years ago)

    Hydraulic modelling conducted for the Mallard Creek Basin indicated that the Mallard Creek interceptor is currently capacity limited under two-year peak flow conditions. Future population and flow projections further suggested that flows in the basin would likely grow about 20 percent every 10 years.

    From: Charlotte (City)