Type : Bid Notification
The work is to be performed between November 2024 through March 2025.The dredging depth for all channels is 22 to 50 feet mean lower low water (ft MLLW) with an additional 1 – 2 foot of allowable overdepth. Approximately 1,740,000 cy will be dredged from the Maryland approach channels (Craighill Entrance, Craighill Angle, Cutoff Angle, and Upper Range Channels) and placed at the Paul S. Sarbanes Ecosystems Restoration Project at Poplar Island.