Search results for: measurement fabricated

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 22
  • Sensors for Passive Temperature Measurement Fabricated using Additive Manufacturing

    Type : Bid Notification

    Due : 17 Nov, 2022 (17 months ago)
    Posted : 23 months ago
    Started : 17 May, 2022 (23 months ago)

    TECHNOLOGY LICENSING OPPORTUNITYSensors for Passive Temperature Measurement Fabricated using Additive ManufacturingA new technique for manufacturing encapsulated melt wire chips for use in nuclear reactors and other high temperature, harsh environments.  

    From: Federal Government (Federal)

  • Brighton Canal Storm Drain Improvements

    Type : Bid Notification

    Due : 14 May, 2024 (in 15 days)
    Posted : 4 days ago
    Started : 18 Apr, 2024 (10 days ago)

    Linear Foot 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P32 24" Pre-Fabricated Steel Waterline Loop - Contingency Item 1 EA - Each 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P33 Adjust Manhole to grade 2 EA - Each 150 days after award 0 - null See 00 43 00 for Measurement and Payment Description P34 Adjust Water Valve to Grade 1 EA - Each 150 days after award 0 - null

    From: Utah (State)

  • Measurement Instrumentation

    Type : Contract

    Due : 31 Dec, 2027 (in about 3 years)
    Posted : about 2 years ago
    Started : 24 Mar, 2022 (about 2 years ago)

    SCOPE:Contract for the purchase of Measurement Instrumentation.

    From: University of Wisconsin (Higher Education)

  • Y1DA--Install Padding Seclusion Rooms (OKC) Padding Install in Mental Health Seclusion Rooms (635-21-1-5406-0180) Purchase & Install Padding in Mental Health Se...

    Type : Pre-Bid Notification

    Due : 17 Jun, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 10 Jun, 2021 (about 2 years ago)

    The padding shall be a minimum of 50mm thick, will be fabricated based on measurements in the attached drawings of each room. The padding will be fire retardant and meet UL standards. Cover will be a cleanable, antibacterial, non-porous, and damage resistant. Padding will be installed as to have no openings, no ligature points, and the fastening system will secure to existing wall with the ability to resist being torn from wall.

    From: Federal Government (Federal)

  • 5670--Handrail and Guardrail Systems

    Type : Bid Notification

    Due : 15 Dec, 2023 (4 months ago)
    Posted : 4 months ago
    Started : 08 Dec, 2023 (4 months ago)

    to field measurements, stainless steel Z bracket with 3" projection, priced per linear foot.

    From: Federal Government (Federal)

  • 5670--HANDRAIL AND GUARDRAIL SYSTEM

    Type : Bid Notification

    Due : 08 Jan, 2024 (3 months ago)
    Posted : 3 months ago
    Started : 02 Jan, 2024 (3 months ago)

    to field measurements, stainless steel Z bracket with 3" projection, priced per linear foot.

    From: Federal Government (Federal)

  • C--OR-HART MTN KIOSK & EXHIBITS

    Type : Bid Notification

    Due : 02 Aug, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 19 Jul, 2018 (about 5 years ago)

    All pertinent drawings and technical design details of the Hart Mountain Refuge Headquarters office site and visitor room, and measurements and details for all existing commercial pre-fabricated kiosks.5.2. Content experts for visitor, biological, historical, and cultural topics.5.3.

    From: Federal Government (Federal)