Type : Bid Notification
08-1E4604 Construct raised median curbs and left turns, and widen shoulders. Department of Transportation 10/31/2018 2:00PM PDT Posted
08-1E4604 Construct raised median curbs and left turns, and widen shoulders. Department of Transportation 10/31/2018 2:00PM PDT Posted
Blanchard Quiet Zone Median Curb Construction Project | Proposal for Bidding Purposes 11/30/17 12/08/17 Results
The Murrieta Hot Springs Road and Madison Avenue Median Project includes removal and reconstruction of the existing medians in order to extend the length of the left turn pockets, as well as installation of one new pin down median. Median curbs shall be pin down style. Other work includes the installation of asphalt and aggregate base, pavers and striping as shown on the plans, these special provisions or as directed by the City Engineer.
The Murrieta Hot Springs Road and Madison Avenue Median Project includes removal and reconstruction of the existing medians in order to extend the length of the left turn pockets, as well as installation of one new pin down median. Median curbs shall be pin down style.
and median noses in accordance with the specifications.
Scope Scope of Work: This Project includes the reconstruction of approximately 7,900 LF of Yorktown Boulevard from Rodd Field Road to Oso Creek Bridge with new HMAC (Base Bid 1) or Concrete (Base Bid 2) pavement and new curb, median, and concrete sidewalk/ shared use path. Also included are improvements and upgrades to the Storm Water, Water, Wastewater, Gas, Lighting Infrastructure, and Traffic Signals.