Type : Bid Notification
for the LUDDINGTON METER VAULT REPLACEMENT in South Orange, NJ.
for the LUDDINGTON METER VAULT REPLACEMENT in South Orange, NJ.
48-In Finished Water Meter and Vault Replacement Bid Number: 18-19-103 Bid Type: Bids Due Date: 1/15/2019 3:00:00 PM Contact: Patricia Armstrong Cost: Conference: December 5, 2018 at 11:30 AM - 1009 Bayan Blvd, West Palm Beach Question Cutoff: 12/9/2018 5:00:00 PM Question Email Recipient: Awarded To: Addenda ITB 18-19-103 Plans and Specifications ITB 18-19-103 Schedule of Bid Items ITB
Laburnum Avenue Meter Vault Replacement IFB : L180011441R Summary Richmond Govt. CITY OF RICHMOND Lana Agostini Construction Invitation for Bids (IFB) Published On : 3/13/18 Amended On : Closing On : 4/12/18 2:30 PM Intent Posted On: Open Time Left : 29 Days
ID: 642322 Cottonwood Park Meter Vault Replacement CDBG Project, Uintah, UT Weber CountyOwner Reference: CP23-47Bid Date: 10/27/2022 at 11:00AM Bids TodayTrades: General Engineering Contractor GEC; Subcontractor OpportunitiesLicenses: A, E100, CO-01, CG, RG, A, AUintah Ciry is accepting sealed Bids for the construction of the Cottonwood Park Meter Vault Replacement CDBG ProjectMatt Hartvigsen Upgrade Membership Upgrade MembershipOwner: Login or create
Summary: The scope of work under this phase of the project includes mobilization of equipment and personnel, demobilization, removal of existing meter vaults, site demolition, excavation and backfill, installation of new meter vaults, removal and replacement of sidewalk (material and labor), traffic control, test pits, utility coordination, removal and replacement of plants/landscaping, and site restoration as necessary to provide a complete vault
Summary: The scope of work under this phase of the project includes mobilization of equipment and personnel, demobilization, removal of existing meter vaults, site demolition, excavation and backfill, installation of new meter vaults, removal and replacement of sidewalk (material and labor), traffic control, test pits, utility coordination, removal and replacement of plants/landscaping, and site restoration as necessary to provide a complete vault
Summary: The scope of work under this phase of the project includes mobilization of equipment and personnel, demobilization, removal of existing meter vaults, site demolition, excavation and backfill, installation of new meter vaults, removal and replacement of sidewalk (material and labor), traffic control, test pits, utility coordination, removal and replacement of plants/landscaping, and site restoration as necessary to provide a complete vault