Search results for: meter replacement

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 1,279
  • (ITB) - Commercial Meter Replacement Services - P05

    Type : Bid Notification

    Due : 16 May, 2024 (in 18 days)
    Posted : 1 month ago
    Started : 19 Mar, 2024 (1 month ago)

    This project requires the awardee to provide all labor, materials, equipment,tools, permits, supervision, and transportation necessary to provide Commercial Meter Replacement Services in accordance with the scope of services/work, terms and conditions specified in the solicitation.

    From: Houston (City)

  • Sealed Bids for Contract No. 1 System Wide Meter Replacement Project will be rec...

    Type : Bid Notification

    Due : 01 May, 2024 (in 3 days)
    Posted : 1 month ago
    Started : 28 Mar, 2024 (1 month ago)

    Sealed Bids for Contract No. 1 System Wide Meter Replacement Project will be received by Kokomo-Shiloh Water Association herein called the Owner, at the Office of Dungan Engineering located at 1574 Highway 98 East, Columbia, MS 39429 until May 1, 2024 Number: 3170028065 Smart Number: 10780-20240318084438 KSWA Meter RFx Type: MDA - RFx Advertised Date: 03/28/2024 12:00 AM Submission Date: 05/01/2024 10:00 AM Major Procurement Category: CONSTRUCTION

    From: Mississippi (State)

  • Water Meter Replacement Phase 1

    Type : Bid Notification

    Due : 24 Apr, 2024 (3 days ago)
    Posted : 7 days ago
    Started : 11 Mar, 2024 (1 month ago)

    2024 ENG 3 - Water Meter Replacement Phase 1 postdate:- 03/11/2024 02:49 PM EDT responsedate:- 04/24/2024 02:00 PM EDT Solicitation Number:- 2024 ENG 3 Advanced metering infrastructure, customer information system, and replacement or modification of existing meters 4" diameter and larger

    From: Ypsilanti Community Utility Authority (Utilities)

  • 1141-24-DN LARGE METER REPLACEMENT PROJECT PHASE 3

    Type : Bid Notification

    Due : 23 Apr, 2024 (4 days ago)
    Posted : 1 month ago
    Started : 27 Mar, 2024 (1 month ago)

    Summary: REPLACE LARGE METERS FOR PUBLIC UTILITIES Round Information: Clarify timeframe DocumentsIFB 1141-24-DN Large Meter Raplacement Project phase 3.pdfAddendum #1 1141-24-DN LARGE METER REPLACEMENT PHASE 3.pdfDocumentsDocumentSizeDescriptionPosted OnType IFB 1141-24-DN Large Meter Raplacement Project phase 3.pdf(7.87 MB)BID DOCUMENTS3/27/24RFx Document Addendum #1 1141-24-DN LARGE METER REPLACEMENT PHASE 3.pdf(217.64 KB)Addendum #14/16/24RFx Document

    From: Virginia (State)

  • Large Water Meter Replacement

    Type : Bid Notification

    Due : 11 May, 2023 (11 months ago)
    Posted : 11 months ago
    Started : 26 Apr, 2023 (12 months ago)

    Large Water Meter Replacement Status: Open Category: MGL c. 30/39M Public Works Construction Projects Published Date: 04/26/2023 9:59 am Due Date: May 11, 2023

    From: Woburn (City)

  • Intermediate and Large Meter Replacement Project

    Type : Bid Notification

    Due : 11 Apr, 2024 (16 days ago)
    Posted : 1 month ago
    Started : 13 Mar, 2024 (1 month ago)

    Bid Number:24-50 Bid Title:Intermediate and Large Meter Replacement Project Category:PurchasingStatus:Open Description: The Town of Lexington invites sealed bids for the Intermediate and Large Meter Replacement Project, to be received at:Town Office Building- Purchasing Office 1625 Massachusetts Ave Lexington, MA 02420Until 11:30 AM on Thursday, April 11, 2024 (due date extended via addendum #1, posted below)Bid documents may be obtained below.

    From: Lexington (Town)

  • Water Meter Replacement Program

    Type : Bid Notification

    Due : 03 Apr, 2023 (13 months ago)
    Posted : 13 months ago
    Started : 07 Mar, 2023 (13 months ago)

    Water Meter Replacement Program Project Description :The Town of Olds currently has 4,003 Meters of varying sizes installed throughout the municipality. In an effort to improve reading accuracy, leak detection, alerts, and alarms, etc., the Town is looking to adopt Advanced Metering Infrastructure. The town is looking to replace all meters over a three-year period.

    From: MerX (Federal)