Search results for: mitigation and structural repairs

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 132
  • METRO VENTILATION SYSTEM NOISE MITIGATION AND STRUCTURAL REPAIRS

    Type : Bid Notification

    Due : 17 Jan, 2024 (3 months ago)
    Posted : 6 months ago
    Started : 12 Oct, 2023 (6 months ago)

    , stair landing replacement, and miscellaneous stair repair, and structural steel as shown on the contract drawings and the contract specifications.

    From: Maryland (State)

  • Camp Dodge Building A-22 Water Mitigation and Structural Repairs

    Type : Bid Notification

    Due : 26 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 05 May, 2022 (about 2 years ago)

    The Department of Public Defense - on behalf of the Iowa National Guard, is seeking bids for the above project. See attached Advertisement for additional information and bid due date details.

    From: Iowa Department of Administrative Services (State)

  • 686 Grand Canyon Drive

    686 Grand Canyon Drive

    Type : Contract

    Due : 11 Jul, 2024 (in 2 months)
    Posted : 1 month ago
    Started : 14 Mar, 2024 (1 month ago)

    PROJECTS Helpful Hint:You can use the arrows to sort the projects by values in each column. Use to sort ascending order. Use to sort descending order.

    From: Madison (City)

  • Pheasant Branch Greenway Enhancement

    Pheasant Branch Greenway Enhancement

    Type : Contract

    Due : 29 Aug, 2024 (in 3 months)
    Posted : 1 month ago
    Started : 07 Mar, 2024 (1 month ago)

    PROJECTS Helpful Hint:You can use the arrows to sort the projects by values in each column. Use to sort ascending order. Use to sort descending order.

    From: Madison (City)

  • Warner Park Lagoon Channel Improvements

    Type : Contract

    Due : 11 Jul, 2024 (in 2 months)
    Posted : 11 months ago
    Started : 14 May, 2023 (11 months ago)

    PROJECTS Helpful Hint:You can use the arrows to sort the projects by values in each column. Use to sort ascending order. Use to sort descending order.

    From: Madison (City)

  • DOD SBIR 24.2 Annual

    Type : Bid Notification

    Due : 12 Jun, 2024 (in 1 month)
    Posted : 10 days ago
    Started : 09 Apr, 2024 (25 days ago)

    Impact and handling tolerance or provide indication and/or warning when critical flaw size is exceeded. Navy requires composite structures meet MIL-M-8856B “barely visible impact damage” [(Ref 4] and still have 100% structural capability. Composite structures must withstand pressure loads, flight loads, and captive carry loads with such damage. 6.

    From: Small Business Innovation Research (Federal)

  • EN24TFF005 Forest Service Road and Bridge Maintenance - Boundary

    Type : Bid Notification

    Due : 18 May, 2023 (11 months ago)
    Posted : 11 months ago
    Started : 27 Apr, 2023 (12 months ago)

    Project works assigned under this contract vary in nature from basic repairs or routine maintenance and road deactivation to more complex work including implementation of measures of a structural or construction nature, prescribed by a Professional Engineer or Geoscientist. Additional activities may include structural upgrades, repairs and deactivation, and reconstruction of roads and bridges.

    From: Canada (Federal)