Search results for: mmd north adit tunnel

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 8 of 8
  • MMD NORTH ADIT TUNNEL REPAIRS

    Type : Bid Notification

    Due : 12 Sep, 2022 (19 months ago)
    Posted : 21 months ago
    Started : 29 Sep, 2022 (19 months ago)

    ** 09/12/2022 - BID OPENING WEB EX INFO HAS BEEN CHANGED TO THE FOLLOWING: https://usace1.webex.com/meet/tyrone.b.palaganas **Work consists of providing all plant, labor, materials, etc. needed to develop and install repairs to the North Adit Tunnel at Mount Morris Dam, Mount Morris, NY.The NAICS is 236220 Size Standard is $39,500,000PLEASE NOTE CHANGES

    From: Federal Government (Federal)

  • Z1DA--695-21-110 Repair North Campus Steam Tunnel

    Type : Award

    Due : 16 Jun, 2024 (in 1 month)
    Posted : 7 months ago
    Started : 17 Apr, 2024 (10 days ago)

    SUBJECT: Notice of Award Contract 36C25224C0016, Project # 695-21-110 Repair North Campus Steam Tunnel at the Clement J. Zablocki VA Medical Center, Milwaukee, WI

    From: Federal Government (Federal)

  • KY-17 Corridor Tunnel

    Type : Bid Notification

    Due : 09 Nov, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 03 Oct, 2023 (6 months ago)

    Bid Opening Information: Nov. 9, 2023 at 2:00 PM EST Related Documents: Notice to Bidders - KY-17 Corridor Tunnel (pdf) Return To Main Bid Postings Page

    From: Sanitation District No. 1 (Utilities)

  • Northside Interceptor Tunnel

    Type : Bid Notification

    Due : 27 Jun, 2023 (10 months ago)
    Posted : 11 months ago
    Started : 20 Apr, 2023 (12 months ago)

    Other project components include 2,136 feet of 8 feet ID combined sewer installed by tunneling in soft ground conditions, one 60 feet ID by 80 feet deep tunnel diversion structure shaft with internal baffle drop, three deep baffle drop shafts, two deep plunge drop shafts, four tunnel adits, 450 LF of twin 90-inch ID overflow pipe installed in tunnel, 570 LF of 4-feet finished dewatering pipe installed by trenchless methods, more than 850 LF of cut

    From: Akron (City)

  • Construction of Twin Tube Unidirectional Tunnel

    Type : Contract

    Due : 16 Apr, 2024 (11 days ago)
    Posted : 3 months ago
    Started : 29 Nov, 2023 (5 months ago)

    Work DescriptionConstruction of Twin Tube Unidirectional Tunnel 2-Lanes in the Kozhikode and Wayanad Districts of Kerala State on EPC Basis incl.

    From: Konkan Railway Corporation Ltd. (Federal)