Search results for: modeling and plant capacity

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 27
  • WasteWater Master Plan - Sanitary Sewer Modeling and Plant Capacity Study

    Type : Bid Notification

    Due : 15 Aug, 2022 (20 months ago)
    Posted : 21 months ago
    Started : 14 Jul, 2022 (21 months ago)

    See more details...

    From: MerX (Federal)

  • Cheyenne Mountain Air Force Station - Generator Replacement

    Type : Bid Notification

    Due : 09 Jun, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 25 May, 2021 (about 2 years ago)

    In addition, the constructability analysis must conduct a structural and dynamic analysis of the generator building when adding equipment as well as the impact of additional weight (or reduced weight) on the springs and damper system.  The analysis shall also include required designs for the hoists systems to remove the old generators and install the new generators.  

    From: Federal Government (Federal)

  • Sanitary Sewer Facilities Plan

    Type : Bid Notification

    Due : 12 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 01 Feb, 2024 (2 months ago)

    Summary of the existing system and environmental needs b. Summary of the future environment without the project 21 c. Summary of the alternatives generation, evaluation, and selection process which led to the preferred alternative H. Phased Construction 1. Determine if adding plant capacity or extending sewers in phases during the planning period is more cost effective/affordable than full construction initially 2.

    From: Rhode Island (State)

  • ECUP Infrastructure Upgrades 2023

    Type : Bid Notification

    Due : 17 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 27 Oct, 2021 (about 2 years ago)

    This project will require the successful engineering firm to display excellence in Central Plant Design, Chilled Water and Condenser Water Systems, Site Hydronic Distribution, Variable Primary Pumping Systems, Plant Automation systems, Electrical Distribution Engineering and Structural Analysis & Engineering. In addition, expertise in hydraulic modeling are important attributes to properly designing the piping system within the plant.

    From: Ohio Facilities Construction Commission (State)

  • ECUP Infrastructure Upgrades 2023

    Type : Bid Notification

    Due : 17 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 27 Oct, 2021 (about 2 years ago)

    This project will require the successful engineering firm to display excellence in Central Plant Design, Chilled Water and Condenser Water Systems, Site Hydronic Distribution, Variable Primary Pumping Systems, Plant Automation systems, Electrical Distribution Engineering and Structural Analysis & Engineering. In addition, expertise in hydraulic modeling are important attributes to properly designing the piping system within the plant.

    From: Ohio Facilities Construction Commission (State)

  • ECUP Infrastructure Upgrades 2023

    Type : Bid Notification

    Due : 17 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 27 Oct, 2021 (about 2 years ago)

    This project will require the successful engineering firm to display excellence in Central Plant Design, Chilled Water and Condenser Water Systems, Site Hydronic Distribution, Variable Primary Pumping Systems, Plant Automation systems, Electrical Distribution Engineering and Structural Analysis & Engineering. In addition, expertise in hydraulic modeling are important attributes to properly designing the piping system within the plant.

    From: Ohio Facilities Construction Commission (State)

  • ECUP Infrastructure Upgrades 2023

    Type : Bid Notification

    Due : 17 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 27 Oct, 2021 (about 2 years ago)

    This project will require the successful engineering firm to display excellence in Central Plant Design, Chilled Water and Condenser Water Systems, Site Hydronic Distribution, Variable Primary Pumping Systems, Plant Automation systems, Electrical Distribution Engineering and Structural Analysis & Engineering. In addition, expertise in hydraulic modeling are important attributes to properly designing the piping system within the plant.

    From: Ohio Facilities Construction Commission (State)