Type : Bid Notification
The Design-Builder will be required to enter into a CCDC 14 – 2013 Design-Build Stipulated Price Contract modified by Supplemental Conditions as per the terms and conditions of the RFP document.
The Design-Builder will be required to enter into a CCDC 14 – 2013 Design-Build Stipulated Price Contract modified by Supplemental Conditions as per the terms and conditions of the RFP document.
Modified Design Build Services for Fighter Squadron Facility Project Description :Advanced Procurement Notice Future Fighter Capabilities Project (FFCP) CFB Cold Lake, AB (With Security Requirements) Purpose of this Advanced Procurement NoticeThis is NOT a bid solicitation.
Defence Construction Canada (DCC) is calling for abbreviated proposals from consulting firms to establish Standing Offer (SO) to provide “as and when required” cost consulting services specific to Department of National Defence (DND) requirements for various locations across Canada. Information provided by the Proponents will be evaluated using the established criteria in the RFAP. The Security Requirements for this project are identified in the RFAP Documents. The SO will be established for a period of three (3) years with a maximum estimated value of $ 1,800,000.00. Call-ups under the SO are expected to be valued between $ 60,000.00 and $ 300,000.00. Refer to the RFAP document for additional information. Firms that consider themselves qua...
The Environmental Protection Agency, in partnership with the General Services Administration (GSA) is seeking contractors to visit Brownsville, TX and develop an addendum to a previous Greening America's Communities (GAC) report, which includes modified design options in light of proposed changes to an expanded land port of entry (LPOE) in the same area that the GAC report explored.
Future Fighter Capability Project (FFCP) - Work Package 3.2.2e TP1 Project Description :EllisDon is the Construction Manager of the Modified Design Build Team on the FFCP project. EllisDon is looking to get pricing and proposals to procure long lead items ahead of the upcoming Site Utilities - Electrical scope of work under a separate Tender Package.