Type : Bid Notification
The Design-Builder will be required to enter into a CCDC 14 – 2013 Design-Build Stipulated Price Contract modified by Supplemental Conditions as per the terms and conditions of the RFP document.
The Design-Builder will be required to enter into a CCDC 14 – 2013 Design-Build Stipulated Price Contract modified by Supplemental Conditions as per the terms and conditions of the RFP document.
Modified Design Build Services for Fighter Squadron Facility Project Description :Advanced Procurement Notice Future Fighter Capabilities Project (FFCP) CFB Cold Lake, AB (With Security Requirements) Purpose of this Advanced Procurement NoticeThis is NOT a bid solicitation.
Defence Construction Canada (DCC) is calling for abbreviated proposals from consulting firms to establish Standing Offer (SO) to provide “as and when required” cost consulting services specific to Department of National Defence (DND) requirements for various locations across Canada. Information provided by the Proponents will be evaluated using the established criteria in the RFAP. The Security Requirements for this project are identified in the RFAP Documents. The SO will be established for a period of three (3) years with a maximum estimated value of $ 1,800,000.00. Call-ups under the SO are expected to be valued between $ 60,000.00 and $ 300,000.00. Refer to the RFAP document for additional information. Firms that consider themselves qua...
Future Fighter Capability Project (FFCP) - Work Package 3.2.2e TP2 Project Description :EllisDon is the Construction Manager of the Modified Design Build Team on the FFCP project. EllisDon is looking to get pricing and proposals to procure for the CL FFCP Work Package 3.2.2e Tender Package 2 Site Utilities - Electrical scope of work.
Multi-Purpose Building Yellowknife Project Description :PCL in partnership with Stantec Architecture have been appointed the Design Builder under a Modified Design Build Contract for the project. The project comprises of two distinct phases, the Design Phase, and the Implementation Phase (Construction Phase). The design phase is complete.