Type : Bid Notification
The Design-Builder will be required to enter into a CCDC 14 – 2013 Design-Build Stipulated Price Contract modified by Supplemental Conditions as per the terms and conditions of the RFP document.
The Design-Builder will be required to enter into a CCDC 14 – 2013 Design-Build Stipulated Price Contract modified by Supplemental Conditions as per the terms and conditions of the RFP document.
Project Description :
(ÉCA) ou estimateur en construction certifié (ECC) Personnel principal unitOfMeasure : Hourly Rate description : Intermediate Professional Quantity Surveyors (PQS) or Construction Estimator Certified (CEC) Personnel Économistes en construction agréés (ÉCA) ou estimateur en construction certifié (ECC) Personnel intermédiaire unitOfMeasure : Hourly Rate description : Junior Professional Quantity Surveyors (PQS) or Construction Estimator Certified
Work will include engineering, design, permitting and construction (including ADA entry ......
Department is requesting proposals from qualified and experienced Design-Builders to provide design, engineering, permitting and construction for the City’s Splash Pad located at 37800 Church Avenue, Dade ......
Future Fighter Capability Project (FFCP) - Work Package 3.2.2e TP2 Project Description :EllisDon is the Construction Manager of the Modified Design Build Team on the FFCP project. EllisDon is looking to get pricing and proposals to procure for the CL FFCP Work Package 3.2.2e Tender Package 2 Site Utilities - Electrical scope of work.
Multi-Purpose Building Yellowknife Project Description :PCL in partnership with Stantec Architecture have been appointed the Design Builder under a Modified Design Build Contract for the project. The project comprises of two distinct phases, the Design Phase, and the Implementation Phase (Construction Phase). The design phase is complete.