Search results for: modifying ramp

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 34
  • Modifying Ramp Metering Systems

    Type : Bid Notification

    Due : 20 May, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 26 Apr, 2021 (about 3 years ago)

    08-Riv,SBd-10, 15, 60, 91, 210, etc.-Var   ***   RIVERSIDE AND SAN BERNARDINO COUNTIES AT VARIOUS LOCATIONS

    From: California (State)

  • Modifying ramp metering systems.

    Type : Bid Notification

    Due : 17 Jan, 2024 (3 months ago)
    Posted : 5 months ago
    Started : 27 Nov, 2023 (5 months ago)

    07-LA-105-R4.3/R5.0 *** LOS ANGELES COUNTY IN INGLEWOOD AND HAWTHORNE FROM 0.1 MILE EAST OF YUKON AVENUE UNDER CROSSING TO 0.3 MILE EAST OF CRENSHAW BOULEVARD UNDERCROSSING

    From: California (State)

  • Modifying ramp metering systems and place HMA (Type A).

    Type : Bid Notification

    Due : 15 Sep, 2022 (19 months ago)
    Posted : 21 months ago
    Started : 08 Aug, 2022 (21 months ago)

    04-SCl-9, 17, 85, 87, 101, etc-VAR *** SANTA CLARA COUNTY AT VARIOUS LOCATIONS

    From: California (State)

  • Modifying ramp metering, fiber optic cable and communication systems.

    Type : Bid Notification

    Due : 25 Oct, 2022 (18 months ago)
    Posted : 19 months ago
    Started : 19 Sep, 2022 (19 months ago)

    07-LA-2,5,91,105-VAR *** LOS ANGELES COUNTY AT VARIOUS LOCATIONS

    From: California (State)

  • The Smart 25 Project limits are along NB I-25 from Ridgegate to University. There is additional ITS work along 225 between Parker Road and I-25.The purpose of t...

    Type : Bid Notification

    Due : 18 Jan, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 22 Dec, 2017 (about 6 years ago)

    There is additional ITS work along 225 between Parker Road and I-25.The purpose of the project is to install devices and equipment required to operate a coordinated ramp metering demonstration project along NB I-25. Included in the work will be modifying existing ramp meter configurations both pavement markings and ramp signal equipment.The Dry Creek Ramp will be widened to accommodate additional capacity.

    From: Colorado Department of Transportation (Transportation)

  • The Smart 25 Project limits are along NB I-25 from Ridgegate to University. There is additional ITS work along 225 between Parker Road and I-25.The purpose of t...

    Type : Bid Notification

    Due : 19 Apr, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 29 Mar, 2018 (about 6 years ago)

    There is additional ITS work along 225 between Parker Road and I-25.The purpose of the project is to install devices and equipment required to operate a coordinated ramp metering demonstration project along NB I-25. Included in the work will be modifying existing ramp meter configurations both pavement markings and ramp signal equipment.The Dry Creek Ramp will be widened to accommodate additional capacity.

    From: Colorado Department of Transportation (Transportation)

  • Fiber optic cable, ramp metering and modifying lighting systems.

    Type : Bid Notification

    Due : 13 Dec, 2023 (4 months ago)
    Posted : 6 months ago
    Started : 30 Oct, 2023 (6 months ago)

    08-Riv-60-16.1/22.5 *** RIVERSIDE COUNTY IN AND NEAR MORENO VALLEY FROM 0.3 MILE WEST OF PERRIS BOULEVARD UNDERCROSSING TO 0.4 MILE EAST OF GILMAN SPRINGS ROAD OVERCROSSING

    From: California (State)