Search results for: monitor beamline

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 6 of 6
  • Hardware for Beam Size Monitor Beamline

    Type : Bid Notification

    Due : 15 Aug, 2022 (20 months ago)
    Posted : 20 months ago
    Started : 29 Jul, 2022 (21 months ago)

    Argonne National Laboratory (ANL) is initiating upgrades for the Advanced Photon Source-Upgrade (APS-U) project, including one beam size monitor (BSM) beamline using the A:M1 source for optimal emittance measurements. The beamline has two relative beam size monitors (RBSM) for fast emittance/energy-spread measurements, one for the horizontal plane and the other for the vertical plane.

    From: Federal Government (Federal)

  • Blinky-lite Consulting

    Type : Bid Notification

    Due : 01 May, 2023 (11 months ago)
    Posted : 12 months ago
    Started : 17 Apr, 2023 (12 months ago)

    gauge controllers, and gate valve controller control system development (1) RF power control systems design: Includes water cooling monitor, LLRF system interface, and solid-state amplifier control systems development (1) Electron Source control systems design: Includes gun control and water cooling monitor control systems design (1) Beamline control systems design: Includes water cooling monitor, diagnostics, and magnet control systems design OR

    From: Federal Government (Federal)

  • 6515--Crit-Line IV Monitor

    Type : Pre-Bid Notification

    Due : 12 Sep, 2023 (7 months ago)
    Posted : 7 months ago
    Started : 07 Sep, 2023 (7 months ago)

    This is a Brand Name or Equal procurement for Fresenius Line IV Monitors.

    From: Federal Government (Federal)