Search results for: motorized blinds

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 23
  • ITB# 6567 - MOTORIZED BLINDS INSTALLATION PROJECT

    Type : Bid Notification

    Due : 17 Nov, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 21 Oct, 2021 (about 2 years ago)

    Yes No Documents: Documents as of 11/4/2021 ITB 6567 Motorized Blinds with Installation.pdf

    From: Johnson (City)

  • 72--Commercial Motorized Blinds

    Type : Bid Notification

    Due : 21 Aug, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 14 Aug, 2017 (about 6 years ago)

    FOB Destination shall be Valentine, NE 69201The DOI NPS MWR NEKOTA MABO requires the following items, Meet or Exceed, to the following:LI 001: Commercial Motorized Shades and installation (10 sizes).

    From: Federal Government (Federal)

  • REPAIR MOTOR ON MOTORIZED BLINDS AT ATF

    Type : Contract

    Due : 24 Dec, 2023 (4 months ago)
    Posted : 7 months ago
    Started : 25 Sep, 2023 (7 months ago)

    REPAIR MOTOR ON MOTORIZED BLINDS AT ATF Solicitation ID/Procurement Identifier: 47PM0623D0002 Ultimate Completion Date: Sun Dec 24 18:00:00 GMT 2023

    From: Federal Procurement Data System (Federal)

  • Motored Laser Safety Blinds

    Type : Bid Notification

    Due : 28 Apr, 2017 (about 7 years ago)
    Posted : about 7 years ago
    Started : 03 Apr, 2017 (about 7 years ago)

    Each motorized laser safety blind should be individual controlled. Also, the motorized laser safety blinds should have wall panel control switches, not wireless, and at least pure flat black color on the laser side.  List any redundancy or actuation of the laser safety blinds if the motor portion for the motorized laser safety blinds fails. 

    From: Federal Government (Federal)

  • Replace Roof on Building 624

    Type : Award

    Due : 09 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 21 Aug, 2020 (about 3 years ago)

    Disconnect and remove motorized blinds at the skylights. Replace water damaged suspended ceilings in the performance spaces and theatre entrance. Replace lighting fixtures in these ceilings. Remove existing and install new lightning protection system. Remove, salvage and reinstall exterior roof-mounted light fixtures. Replace existing fixed ladder from lower to upper roof to conform to current code requirements.

    From: Illinois Public Higher Education (Higher Education)

  • IFB-Blinds & Roller Shades_Northern Virginia Comm....

    Type : Bid Notification

    Due : 22 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 17 Nov, 2022 (17 months ago)

    IFB-Blinds & Roller Shades_Northern Virginia Comm....

    From: Manassas (City)

  • Window Washing Building 570, KAFB

    Type : Award

    Due : N/A
    Posted : about 3 years ago
    Started : 25 Jun, 2020 (about 3 years ago)

    Access to office space must be coordinated through AFRL/RVOI construction manager. 5.2          The Contractor shall repair and (if necessary) replace with like materials the existing motorized blinds on the atrium windows as they are currently not in working order.  5.3          The contractor shall verify all dimensions in field prior to starting work or ordering pre-fabricated equipment and materials, as well as verify all quantities, sizes

    From: Federal Government (Federal)