Search results for: multi-point load

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 495
  • Multi-Point Load Test Cell

    Type : Bid Notification

    Due : 13 May, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 29 Apr, 2022 (about 2 years ago)

    Multi Point Load Test Cell. Sole Source to Chant Engineering.

    From: Federal Government (Federal)

  • Repair of the KC-135R Multi-Point Refueling System

    Type : Bid Notification

    Due : 13 Sep, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 12 Aug, 2021 (about 2 years ago)

    Repair / Overhaul of the KC-135 Multi-Point Refueling system will be a Sole-Source, Firm-Fixed-Price, Requirements-type contract with a 1-year basic and four 1-year options.

    From: Federal Government (Federal)

  • 15759P-HARDWARE-PROXIM TSUNAMI MULTI-POINT WIRELESS BRIDGES

    Type : Bid Notification

    Due : 09 Jan, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 26 Dec, 2017 (about 6 years ago)

    TSUNAMI MULTI-POINT WIRELESS BRIDGESContact Name : Sau LeeContact Phone# : (323) 881-4583Contact Email : slee@isd.lacounty.govLast Changed On : 1/10/2018 3:45:05 AM  The County of Los Angeles is pleased to announce the Vendor Self-Service (VSS) Portal. 

    From: Los Angeles (County)

  • Andor Dragonfly 505 multi-point confocal imaging system

    Type : Bid Notification

    Due : 17 Aug, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 09 Aug, 2018 (about 5 years ago)

    FMIC requires a system that will broaden its imaging capability with a multi-modal imaging system that contains 1) multi-point confocal for fast scanning, 2) simultaneous dual color TIRF, and 3) Super-Resolution down to 20nm. Specifications listed below:The FMIC requires:1. A multi-point confocal for high temporal imaging at 400 frames per second with the option of 2 pinhole choices2.

    From: Federal Government (Federal)

  • Multi-Point Refueling System (MPRS) Low Fuel Pressure Trail Lock-Out

    Type : Bid Notification

    Due : 31 Mar, 2023 (13 months ago)
    Posted : 14 months ago
    Started : 28 Feb, 2023 (14 months ago)

    Safety driven logic check update for installation into the KC-135 Multi-Point Refueling System (MPRS) Pod Control (PC) panel. Theupdate must be able to confirm that the fuel pressure in the MPRS is sufficient to safely trail the hose when TRAIL is selected,and to lock out the selection if the fuel pressure is not sufficient, simultaneously providing a visual and audio notification to theBoom Operator (BO) when this condition exists.

    From: Federal Government (Federal)

  • SOLICITATION CANCELLED - 15759P-HARDWARE-PROXIM TSUNAMI MULTI-POINT WIRELESS BRIDGES

    Type : Bid Notification

    Due : 19 Dec, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 05 Dec, 2017 (about 6 years ago)

    Description : 15759P-HARDWARE-PROXIM TSUNAMI MULTI-POINT WIRELESS BRIDGESContact Name : Sau LeeContact Phone# : (323) 881-4583Contact Email : slee@isd.lacounty.govLast Changed On : 12/29/2017 3:45:13 AM  The County of Los Angeles is pleased to announce the Vendor Self-Service (VSS) Portal. 

    From: Los Angeles (County)

  • Department of State Multi-Point Lock Requirements for DOS Approved FE/BR or Blast Resistant Doors

    Type : Bid Notification

    Due : 23 Jul, 2022 (21 months ago)
    Posted : 23 months ago
    Started : 23 May, 2022 (23 months ago)

    Informational Notice Only - SEE ATTACHMENT DOS approval by the DS Lock shop is required for all multi-point (MP) locks used in DOS approved FE/BR or blast resistant doors. Compliance with all the requirements in attachment is required for DOS approval. Any features, or requirements, that are optional are marked accordingly in the requirements in attachment.

    From: Federal Government (Federal)