Search results for: municipal airport reconstruct

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 38
  • 23-149 Brookhaven Calabro Municipal Airport Reconstruct Runway 15-33 Edge Lighting and Signage

    Type : Contract

    Due : 06 Jun, 2023 (10 months ago)
    Posted : 11 months ago
    Started : 26 May, 2023 (11 months ago)

    23-149 Brookhaven Calabro Municipal Airport Reconstruct Runway 15-33 Edge Lighting and Signage Agency: New York State Contract Reporter Category:Miscellaneous - Construction Issue Date:05/26/2023 Due Date: 06/06/2023 Ad Type:Contractor Ads

    From: New York State Contract Reporter (City)

  • Delta Airport Consultants/ Cambridge Municipal AirportReconstruct Aprons ‘A’, ‘B’, ‘C’; Rehabilitate Taxilanes ‘A’

    Type : Bid Notification

    Due : 31 Mar, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 15 Mar, 2022 (about 2 years ago)

    Cambridge Municipal AirportReconstruct Aprons ‘A’, ‘B’, ‘C’; Rehabilitate Taxilanes ‘A’ – (16028) This project is to reconstruct the main general aviation aircraft parking Apron in front of the Airport Terminal Building area and Rehabilitate the taxilane pavements surrounding the airport T-hangar aircraft storage area at the Cambridge Municipal Airport (CDI) in Cambridge, Ohio.

    From: The Institute Economic Development (State)

  • NW District, City of Trenton, Trenton Municipal Airport, Reconstruct Apro

    Type : Bid Notification

    Due : 24 Aug, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 17 Aug, 2018 (about 5 years ago)

    Specification:- NW District, City of Trenton, Trenton Municipal Airport, Reconstruct Apron and Taxiway Addendum 1 Post Date:- 08/17/18 Due Date:- 08/24/18

    From: Missouri Department of Transportation (Transportation)

  • Malvern Municipal Airport (M78) Reconstruct Runway Lighting

    Type : Bid Notification

    Due : 16 Apr, 2024 (12 days ago)
    Posted : 29 days ago
    Started : 15 Mar, 2024 (1 month ago)

    Description: Description:Removal of the existing direct buried lighting system and installation of a new can and conduit runway lighting system with LED fixtures at the Malvern Municipal Airport.

    From: McClelland Consulting Engineers (Co-op)

  • Morrilton Municipal Airport (BDQ) Reconstruct Runway and Taxiway Lighting

    Type : Bid Notification

    Due : 11 Apr, 2024 (17 days ago)
    Posted : 1 month ago
    Started : 03 Mar, 2024 (1 month ago)

    Description: Description:Removal of the existing direct buried lighting system, installation of a new can and conduit lighting system with LED fixtures, and replacement of the airfield vault at Morrilton Municipal Airport.

    From: McClelland Consulting Engineers (Co-op)

  • SW District, City of Nevada, Nevada Municipal Airport (NVD), Reconstruct Runway 13-31 and Apron Connecting Taxiway

    Type : Bid Notification

    Due : 28 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 30 Mar, 2022 (about 2 years ago)

    Ash Street, Nevada, MO 64772, for furnishing all labor, materials, equipment and performing all work necessary to BASE BID Reconstruct Runway 13-31 and Apron Connecting Taxiway ADD ALTERNATE Install Underdrains Copies of the bid documents including project drawings and technical specifications are on file and may be inspected at: Nevada Municipal Airport Lochner 18098 E.

    From: Missouri Department of Transportation (Transportation)

  • DeWitt Municipal Airport - Whitcomb Field (5M1) Reconstruct Runway Lighting

    Type : Bid Notification

    Due : 11 Apr, 2024 (17 days ago)
    Posted : 1 month ago
    Started : 13 Mar, 2024 (1 month ago)

    Description: Description:Removal of the existing direct buried lighting system and installation of a new can and conduit runway lighting system with LED fixtures at DeWitt Municipal Airport – Whitcomb Field.

    From: McClelland Consulting Engineers (Co-op)