Type : Bid Notification
Justification In Accordance With 10 USC 2304(c)(1) as implemented by FAR 6.302-1(c), Application for brand-name descriptionsThis is for the Natomas Reach A Levee Improvements IFB W9123821B0012
Justification In Accordance With 10 USC 2304(c)(1) as implemented by FAR 6.302-1(c), Application for brand-name descriptionsThis is for the Natomas Reach A Levee Improvements IFB W9123821B0012
This Sources Sought Notice is for Market Research ONLY to determine the availability, capability and interest of small business firms for a potential small business category type set-aside. NO AWARD will be made from this Sources Sought Notice. NO SOLICITATION, SPECIFICATIONS, OR DRAWINGS ARE AVAILABLE AT THIS TIME as this is solely for Market Research; therefore, please do not request such documentation. Requests for any of this information will go unanswered. If the conditions at FAR 19.502-2(b) are met the contracting officer shall set aside the acquisition for small business concerns. If set-aside, FAR 52.219-14, requires that for general construction the small business contractor will self-perform at least 15% of the cost of the contr...
GENERAL SCOPE:The Natomas Reach B (I-5 Window) is located on the east bank of the Sacramento River where the I-5 bridges cross just west of the Sacramento International Airport in Sacramento County. Previous levee improvements were completed in 2011 on either side of the I-5 bridge crossings, leaving the "window" in this contract.
Narrow Aisle Reach Truck Project Description :Narrow Aisle Reach Truck Contact Information :-Purchasing purchasing@burnaby.ca
This project would be implemented under Reach B of the American River Common Features Project in Natomas along the Sacramento River East Levee.This construction will include raising and lengthening the approach ramp of Farm Road connecting to Garden Highway on top of the existing levee, along with repaving and restriping. Traffic closures and detours are required during this construction.
D Pumping Plant 4The Government anticipates issuing an Information for Bid (IFB) with the intent of awarding a Firm-Fixed Price construction contract for W91238-21-B-0002/ Reach D Pumping Plant 4.Project Description: The work includes relocating Pumping Plant 4 discharge pipes to be raised 10 feet to be above the 200-year water surface elevation and adding a new vault and outfall structure.
The Natomas Basin Reach E segment is located along the southwest bank of the Pleasant Grove Creek Canal (PGCC). The PGCC is an artificial channel that trends generally south-southeast to north-northwest, collecting surface water draining from Pleasant Grove Creek and several other seasonal streams from the east. The surface water is directed north-northeast into the Natomas Cross Canal and eventually to the Sacramento River.