Type : Contract
NETWORK CONNECTION FOR CCHCF Solicitation ID/Procurement Identifier: 75H71024P00532 Ultimate Completion Date: Mon Mar 31 17:00:00 GMT 2025
NETWORK CONNECTION FOR CCHCF Solicitation ID/Procurement Identifier: 75H71024P00532 Ultimate Completion Date: Mon Mar 31 17:00:00 GMT 2025
CJIS Compliant Wireless Network Connection Location Colorado Publication Date 04/10/2019 Closing Date 05/01/2019 04:00 PM MDT
traffic signals to allow for network connections to the DuPage Central Signal System.
Synopsis:NASA/NSSC has a requirement for MAX RESEARCH NETWORK CONNECTION FEE. NASA/NSSC intends to issue a sole source contract to MID-ATLANTIC CROSSROADS(MAX) under the authority of FAR 13.106-1(b)(1)(i). It has been determined that MID-ATLANTIC CROSSROADS(MAX) is the only provider of the required servicesNASA/NSSC will be the procuring center for this effort.
The service will provide network connection service linking all Lee County Utilities separating the business and controls networks. This ensures compliance with Homeland Security directives. Opening Date & Time: 6/11/2021 4:00 PM Contact:
From the Bryan Court traffic controller cabinet, the fiber backbone will extend eastward to Cullen Boulevard for future connection to the proposed controller cabinet at the Hughes Ranch Road and Cullen Boulevard intersection. Tw o school flashing beacon assemblies near Challenger Elementary will have fiber connections to the network via a ground box (network connections to be completed after the installation of the flasher assemblies).
From the Bryan Court traffic controller cabinet, the fiber backbone will extend eastward to Cullen Boulevard for future connection to the proposed controller cabinet at the Hughes Ranch Road and Cullen Boulevard intersection. Tw o school flashing beacon assemblies near Challenger Elementary will have fiber connections to the network via a ground box (network connections to be completed after the installation of the flasher assemblies).