Search results for: oil sample analysis

Showing opportunity 1 - 7 of 7
  • CHILLER MAINTENANCE - LIBRARY (219166-002)

    Type : Bid Notification

    Due : 14 Aug, 2025 (in 15 months)
    Posted : 8 days ago
    Started : 04 Apr, 2024 (23 days ago)

    Frequency: ANNUALLY Task and Actions for Annual Maintenance Report to customer on arrival Lubricate equipment as needed Leak test entire unit Calibrate operating controls Inspect contactors Tighten electrical connections Check starter wiring and contacts Check gauges/ indicator lights Review and evaluate log readings Replace oil filter Replace drier cores (W/A) Replace internal compressor filters Brush condenser tubes Oil sample & analysis Lubricate

    From: Erie (County)

  • Buy Indian Set Aside - Emergency Generator Maintenance, Base + 4 Option years for PIHC

    Type : Bid Notification

    Due : 03 May, 2024 (in 6 days)
    Posted : 10 hours ago
    Started : 26 Apr, 2024 (Yesterday)

    (Please include in the pre-priced years if applies)Change oil and oil filter during the first PM of each contract year.Perform oil analysis by sending sample to outside laboratory and providing legible copy of results to the facility manager.Perform coolant maintenance as necessary to include testing for freeze point and inhibitor levels, conditioner shall be added as needed.Preventative maintenance shall be scheduled with the facility manager and

    From: Federal Government (Federal)

  • Lube Oil Testing and Analysis for RRF Maritime Fleet

    Type : Bid Notification

    Due : 16 May, 2024 (in 19 days)
    Posted : 10 days ago
    Started : 16 Apr, 2024 (10 days ago)

    The function of this program is for the ship’s personnel to take oil samples under prescribed operating conditions and time frames and mail these samples to an approved oil testing laboratory for expert analysis to assist and determine the conditions of the identifiedmachinery.

    From: Federal Government (Federal)

  • IFB 2024-01 Electrical Switchgear Testing

    Type : Bid Notification

    Due : 29 Apr, 2024 (in 2 days)
    Posted : 2 months ago
    Started : 29 Jan, 2024 (2 months ago)

    where accessible. • Proper core and equipment grounding verif ied. • Contact resistance measurements performed where applicable. • Auxiliary devices checked for proper operation. • Insulation resistance measurements performed. • Turns Ratio tests performed. • Transformer oil samples to be taken for analysis. • All results submitted in formal bound report.

    From: Department of Corrections and Community Supervision (State)