Type : Bid Notification
Oily Waste removal requirement with solicitation number N4044320Q0016 for USNS GUADALUPE. Please see attachments: SOW and solication.
Oily Waste removal requirement with solicitation number N4044320Q0016 for USNS GUADALUPE. Please see attachments: SOW and solication.
The Coast Guard requests the services of 30,000 gallons total of oily waste removed from a Coast Guard Ship. A vacuum truck or trailer is recommended.Please provide an itemized quote for potential services rendered.Total of: 30,000 GallonsPeriod of Performance: 26MAR19 to 28MAR19USCG Base Seattle1519 Alaskan Way SouthSeattle, WA 98134
Request oily waste offload and disposal of 6,000 gallons estimated via vaccum trucks on 16MAR21 @ 0730 for Coast Guard Cutter Polar Star. Shore connection type is 4'' cam lock. We are able to provide various adaptapters for fittings. Vendor is to provide at least 2 trucks, with one on standby at the location of the service as to expedite this evolution. Vendor is to be registed and active on SAM without any exclusions.
This procurement is for oily waste removal services in support of USNS CHARLES DREW. Contact Information: Thomas W. Muhlethaler, contract specialist, Phone 6195249816, Email thomas.muhlethaler@navy.mil Office Address :140 Sylvester Rd, Bldg. 570Naval Base Point Loma San Diego CA 92106-3521 Location: MSC SSU San Diego (N40443) Set Aside: N/A
This procurement is for oily waste removal services in support of USNS HENRY J. KAISER. Contact Information: Thomas W. Muhlethaler, contract specialist, Phone 6195249816, Email thomas.muhlethaler@navy.mil Office Address :140 Sylvester Rd, Bldg. 570Naval Base Point Loma San Diego CA 92106-3521 Location: MSC SSU San Diego (N40443) Set Aside: N/A
Versamatic parts to go on a bilge oily waste transfer diaphragm pump for a T-AKE class vessel.
USCGC MIDGETT (WMSL-757) is requesting quotes for approximately 4,000 gallons of oily (hazardous) waste offload. The company shall have an over the water permit to transfer oily waste from the cutter to the pier. The contractor shall provide all hoses to accommodate a 150-foot span from the discharge point on the cutter to the contractor provided truck on the pier. Cutter connection is 2” camlock.