Search results for: onsite storage tanks

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 57
  • LIQUID CALCIUM NITRATE INCLUDING ONSITE STORAGE TANKS AND DOSING EQUIPMENT

    Type : Bid Notification

    Due : 20 Feb, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 23 Jan, 2023 (15 months ago)

    Project Title LIQUID CALCIUM NITRATE INCLUDING ONSITE STORAGE TANKS AND DOSING EQUIPMENT Invitation # 35 Bid Posting Date 01/23/2023 5:40 PM (PST) Project Stage Bidding Bid Due Date 02/20/2023 2:00 PM (PST) Response Format Electronic Project Type Bid Response Types Line Items General Attachment (required) Type of Award Lump Sum Categories 325188 - All Other Basic Inorganic Chemical Manufacturing 325998 - All Other Miscellaneous Chemical Product and

    From: San Elijo Joint Powers Authority (State)

  • Fuel Supply LD4 Dewatering project

    Type : Bid Notification

    Due : 22 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 14 Sep, 2020 (about 3 years ago)

    The vendor shall have the capability of delivering amounts of 1000 gallons minimum per delivery with the remainder of fuel (if any) to be received at the customer’s request.The fuel oil/gasoline shall be delivered to onsite storage tanks

    From: Federal Government (Federal)

  • Replace Commercial Boilers

    Type : Bid Notification

    Due : 29 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 07 Mar, 2024 (1 month ago)

    Replace (2) commercial natural gas water heaters, (4) storage tanks, (2) expansion tanks and (2) recirculating pumps onsite at FCI Safford in accordance with the attached terms and conditions.

    From: Federal Government (Federal)

  • Above and Underground Storage Tank

    Type : Bid Notification

    Due : 20 May, 2024 (in 15 days)
    Posted : 2 days ago
    Started : 17 Apr, 2024 (17 days ago)

    The Orange County Transportation Authority (Authority) invites proposals from underground and above ground storage tank services. The budget for this project is $430,000 for a three (3)-year term. Instructions: Firms interested in obtaining a copy of this RFP may do so by downloading the RFP from CAMM NET at https://cammnet.octa.net.

    From: Orange County Transportation Authority (Transportation)

  • North Elevated Water Storage Tank

    Type : Bid Notification

    Due : 16 May, 2024 (in 11 days)
    Posted : 1 month ago
    Started : 18 Mar, 2024 (1 month ago)

    Village of Westmont, IL North Elevated Water Storage Tank May 16, 2024/10:00 A.M. Project Engineer: Charles Brunner – Phone Number: 815-444-3210 Email: cbrunner@baxterwoodman.com Engineer’s Estimate is not available for this project.

    From: Baxter and Woodman (Co-op)

  • GPMD WP 1 Phase 1 to Serve GPS

    Type : Bid Notification

    Due : 23 Aug, 2022 (20 months ago)
    Posted : 21 months ago
    Started : 08 Aug, 2022 (21 months ago)

    Details ID: 1339-022-00, C1 Estimate: Engineer's Estimate is NOT Available Type: Water Plant Improvements Owner: McCord Development on behalf of Generation Park Management District Location Harris County, TX Map Code: 376Y Show Google Map Open Map On Google No Map Scope The construction of a water treatment plant consisting of two onsite water wells, one bolted steel ground storage tank, one hydropneumatic tank, three booster pumps, one CMU building

    From: IDS Engineering Group (State)

  • Provin Mt Water Tank Replacement

    Type : Bid Notification

    Due : 16 Nov, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 25 Oct, 2023 (6 months ago)

    Other work includes improvements to the access road, stormwater improvements, and the decommissioning and demolition of the existing 50 foot tall, 5.0 million gallon capacity, pre-stressed concrete water storage tank onsite. The Work of Additive Alternative A generally consists of the clearing of approximately 1,000 linear feet of the City’s water main easement from the tank site.

    From: Westfield (City)