Type : Bid Notification
Extend the existing Depleted Uranium Conversion Facilities contract with Mid-AmericaConversion Services, LLC (MCS), Contract No. DE-EM0004559 for six months, fromApril 1, 2024 to September 30, 2024.
Extend the existing Depleted Uranium Conversion Facilities contract with Mid-AmericaConversion Services, LLC (MCS), Contract No. DE-EM0004559 for six months, fromApril 1, 2024 to September 30, 2024.
The Credit Union of Texas Event Center estimates a total of 17,500 hours annually for Building Operations and Conversion Labor. Concat Info:-
Type Request for Proposal Status Issued Number 2022-7-120 (Building Operations and Conversion) Issue Date & Time 7/31/2022 08:00:00 AM (CT) Close Date & Time 8/25/2022 02:00:00 PM (CT) Time Left21 hours 45 minutes 7 seconds Notes It is the intention of the City of Allen to enter into a one-year contract for Building Operations and Conversion Services as needed by the City of Allen - Credit Union of Texas Event Center (CUTXEC).
An examination of conversion of the building and operations to a high temperature hydronic configuration 4.
Wireless access points are connected to an Ethernet hub or server and transmit a radio frequency over an area of several hundred to a thousand feet which can penetrate walls and other non-metal barriers. The central radio transmitter/receiver that maintains communications with mobile radiotelephone sets within a wireless cell. 802.11, or IEEE 092.11, is a type of radio technology used for wireless local area networks (WLANS).
The need for the Lift Station Conversion arose due to the existing SCADA software and hardware becoming outdated and not functioning in accordance with our current operations and specifications.
Project Description Conversion of joint operations center into offices for the Office of the Adjutant General https://gvibuy.buyspeed.com/bso/view/login/login.xhtml Due Date Friday, March 17, 2023 - 10:00 am Pre-Bid Meeting Date Monday, March 6, 2023 - 10:00 am Status Open Type IFB District St.