Search results for: optic cable and inner-duct

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 57
  • Fiber Optic Cable and Inner-Duct

    Type : Bid Notification

    Due : 20 Feb, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 10 Feb, 2023 (14 months ago)

    See attached Addendum 1.Brand Name or Equivalent Optical Cable Corporation (OCC) 24 Channel Dx-Series Distribution Chemical Resistant, Plenum Rated Cables 12,000 Feet, 2x 6000-foot reels P/N DX024KSLX9YP1” Smoothwall Innerduct (orange, black & green) 5 count 84” Steel Reels containing 2,500 ft orange, 2,500 ft black, 2,500 ft greenDelivery toFederal Aviation AdministrationATTN: Kirk Harris (NavCom) BWI RTRBaltimore-Washington International Airport

    From: Federal Government (Federal)

  • Fiber Optic Cable (FOC) IDIQ Requirement

    Type : Pre-Bid Notification

    Due : 01 Jan, 2023 (16 months ago)
    Posted : about 2 years ago
    Started : 25 Apr, 2022 (about 2 years ago)

    The work to be performed under the task orders will consist of engineering, furnishing, installing, and testing (EFI&T) new multi-strand, single mode (SM) fiber optic cable (FOC) from buildings and locations across Keesler AFB to include any necessary trenching, boring, ducting, inner-duct, Manholes, Hand-holes, and Pull Boxes or splices at Keesler Air Force Base (KAFB), as specified within the Statement of Objectives (SOO) to be issued via request

    From: Federal Government (Federal)

  • RAF Croughton Underground Cable Install

    Type : Bid Notification

    Due : 25 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 25 Sep, 2020 (about 3 years ago)

    Engineer, furnish, install and test approximately 8 telecommunications maintenance holes,  4,100 linear feet of telecommunications duct bank (multi-duct), 5,800 linear feet of 96-strand outside plant single-mode (non-blown) fiber optic cable between building 180 and building 34,  3,500 linear feet of telecommunications inner-duct, and two 144-port single-mode fiber optic distribution panels at RAF Croughton, United Kingdom. 

    From: Federal Government (Federal)

  • Fiber Optic Cable Installations - Qty 4

    Type : Bid Notification

    Due : 16 Jun, 2023 (10 months ago)
    Posted : 11 months ago
    Started : 12 Jun, 2023 (10 months ago)

    Please confirm that it is assumed all other manhole pathways already have Max cell or inner duct installed and will not be required as part of this contract. CSI-B verified as per SOW3.Please confirm that we are to assume all existing manhole pathways and underground conduits are passable and already have strings installed for use to pull the new fiber optic cable on this project proposal. Confirmed that you are to assume they are passable.

    From: Federal Government (Federal)

  • Job Order (JOC) Contract for Demolition, Repair, and Replacement of Telecommunications Outside Plant and Structured Cabling Located on MCB, Camp Pendleton, CA

    Type : Bid Notification

    Due : 17 Feb, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 04 Feb, 2021 (about 3 years ago)

    Indoor rated fiber optic cable may be installed, terminated, tested and troubleshot on occasion.PE-90 single mode outside plant loose tube fiber will be installed within the textile inner duct and conduit pathway over a variety of distances.  The average length between each pull point will be as little as 500 feet up to 1 mile.  Splicing, terminating, testing, and troubleshooting of the PE-90 will be required. 

    From: Federal Government (Federal)

  • Max Road - Fiber Optic Network Connection

    Type : Bid Notification

    Due : 02 Aug, 2018 (about 5 years ago)
    Posted : about 5 years ago
    Started : 11 Jul, 2018 (about 5 years ago)

    Bid InformationTypeITB-SealedStatusIssuedNumber0518-38 Addendum 3 (Max Road - Fiber Optic Network Connection)Issue Date & Time7/11/2018 09:16:44 AM (CT)Close Date & Time8/2/2018 02:00:00 PM (CT)Time Left4 hours 56 minutes 24 seconds NotesThe project will entail the installation of 96-strand fiber optic cable via 4” HDPE with 4-1” inner ducts, communication ground boxes, and fiber markers from the existing fiber connection at the intersection of

    From: Pearland (City)

  • METRORAIL 3RD RAIL ISOLATION DISCONNECT SWITCH REPLACEMENT

    Type : Bid Notification

    Due : 06 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 18 Jan, 2024 (3 months ago)

    Solicitation Details - IRP338 DTPW23 CT (Capital) Back To Search Solicitations Title: METRORAIL 3RD RAIL ISOLATION DISCONNECT SWITCH REPLACEMENT Opening Date: 3/6/2024 2:00:00 PM Announcement Info: Installation of the necessary conduits, inner ducts and fiber optic cables (single mode only), Fiber panels and related equipment needed to create a Fiber Optic Ring SCADA Network to connect all 52 disconnect switches to the Traction Power Nucleus at the

    From: Miami Dade (County)