Search results for: outlet culvert

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 280
  • Crystal Lake Outlet Culvert Replacement

    Type : Bid Notification

    Due : 02 May, 2017 (about 7 years ago)
    Posted : about 7 years ago
    Started : 31 Mar, 2017 (about 7 years ago)

    The intent of this contract is to provide for the replacement of the Crystal Lake outlet culvert.

    From: Federal Government (Federal)

  • REPLACEMENT OF A CS-98P STORM OUTLET CULVERT - CHEMIN DE LA RÉSERVE / Borough of Chicoutimi (Civil engineering works) --- REMPLACEMENT D'UN PONCE...

    Type : Bid Notification

    Due : 20 Nov, 2023 (5 months ago)
    Posted : 5 months ago
    Started : 19 Oct, 2023 (6 months ago)

    Reference:2023-591 / 1774497 REPLACEMENT OF A CS-98P STORM OUTLET CULVERT - CHEMIN DE LA RÉSERVE / Borough of Chicoutimi (Civil engineering works) --- REMPLACEMENT D'UN PONCEAU ÉMISSAIRE PLUVIAL CS-98P - CHEMIN DE LA RÉSERVE / Arrondissement de Chicoutimi Source:Government of Quebec SEAO - register with SEAO to receive updates, amendments & addenda NEW OR UPDATED November 02, 2023 2023-11-20 11 h (Closing date appears to be Monday, November 20,

    From: Government of Quebec (State)

  • MAIN STREET OVER LITTLE LAKE ERIE OUTLET CULVERT REPLACEMENT PROJECT

    Type : Contract

    Due : 06 Oct, 2022 (18 months ago)
    Posted : about 2 years ago
    Started : 08 Sep, 2022 (19 months ago)

    MAIN STREET OVER LITTLE LAKE ERIE OUTLET CULVERT REPLACEMENT PROJECT Agency: Tusten, Town of Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Issue Date:09/08/2022 Due Date: 10/06/2022 Ad Type:General

    From: New York State Contract Reporter (City)

  • Culvert Outlet Repair at Berlin St/ Highgate Dr

    Type : Bid Notification

    Due : 29 Feb, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 30 Jan, 2024 (2 months ago)

    Culvert Outlet Repair at Berlin St/ Highgate Dr postdate:- 01/30/2024 04:18 PM EST responsedate:- 02/29/2024 12:00 PM EST

    From: Vermont (State)

  • DFW-2020-051: Kampoosa Bog Water Quality and Vegetative Composition Review and Analysis

    Type : Bid Notification

    Due : 07 May, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 09 Apr, 2020 (about 4 years ago)

    In addition, management efforts have been made to treat invasive species and regulate water levels at the Rt. 7 outlet culvert crossing. As a result of these ongoing efforts, several scientific papers have been published, specifically, on the incursion of invasive species and the influence of road-salt runoff into the bog.

    From: Massachusetts (State)

  • Hunters Branch Streambank Stablization Project

    Type : Bid Notification

    Due : 14 Sep, 2023 (7 months ago)
    Posted : 8 months ago
    Started : 09 Aug, 2023 (8 months ago)

    A riprap basin is added to the culvert outlet to calm high velocity flows as a countermeasure to control scouring of the stream bed.

    From: Sandy Springs (City)

  • 1500 Dovercourt Road Culvert Replacement Construction

    Type : Bid Notification

    Due : 02 Feb, 2023 (14 months ago)
    Posted : 16 months ago
    Started : 22 Dec, 2022 (16 months ago)

    The general scope of the works involves, but is not limited to, the following: • Removal of the existing 750mm wood stave storm culvert. • Installation of a new 525mm PVC storm culvert c/w new manhole. • Regrading creek bed at culvert outlet to match new culvert alignment • Regrading and paving of depressed area in the road adjacent to culvert. • Removal and replacement of concrete encased sanitary pipe.

    From: MerX (Federal)