Type : Bid Notification
The intent of this contract is to provide for the replacement of the Crystal Lake outlet culvert.
The intent of this contract is to provide for the replacement of the Crystal Lake outlet culvert.
Reference:2023-591 / 1774497 REPLACEMENT OF A CS-98P STORM OUTLET CULVERT - CHEMIN DE LA RÉSERVE / Borough of Chicoutimi (Civil engineering works) --- REMPLACEMENT D'UN PONCEAU ÉMISSAIRE PLUVIAL CS-98P - CHEMIN DE LA RÉSERVE / Arrondissement de Chicoutimi Source:Government of Quebec SEAO - register with SEAO to receive updates, amendments & addenda NEW OR UPDATED November 02, 2023 2023-11-20 11 h (Closing date appears to be Monday, November 20,
MAIN STREET OVER LITTLE LAKE ERIE OUTLET CULVERT REPLACEMENT PROJECT Agency: Tusten, Town of Category:Construction Horizontal: Highways & Roadways; Maintenance, Repair & New Construction - Construction Issue Date:09/08/2022 Due Date: 10/06/2022 Ad Type:General
Culvert Outlet Repair at Berlin St/ Highgate Dr postdate:- 01/30/2024 04:18 PM EST responsedate:- 02/29/2024 12:00 PM EST
In addition, management efforts have been made to treat invasive species and regulate water levels at the Rt. 7 outlet culvert crossing. As a result of these ongoing efforts, several scientific papers have been published, specifically, on the incursion of invasive species and the influence of road-salt runoff into the bog.
A riprap basin is added to the culvert outlet to calm high velocity flows as a countermeasure to control scouring of the stream bed.
The general scope of the works involves, but is not limited to, the following: • Removal of the existing 750mm wood stave storm culvert. • Installation of a new 525mm PVC storm culvert c/w new manhole. • Regrading creek bed at culvert outlet to match new culvert alignment • Regrading and paving of depressed area in the road adjacent to culvert. • Removal and replacement of concrete encased sanitary pipe.