Type : Contract
REPAIR & PAINT STRUCTURAL MEMBERS GST SHED BLDG S48 AT U.S. COAST GUARD ATC MOBILE, AL. Solicitation ID/Procurement Identifier: PNUM 7820790 Ultimate Completion Date: Tue Dec 20 18:00:00 GMT 2022
REPAIR & PAINT STRUCTURAL MEMBERS GST SHED BLDG S48 AT U.S. COAST GUARD ATC MOBILE, AL. Solicitation ID/Procurement Identifier: PNUM 7820790 Ultimate Completion Date: Tue Dec 20 18:00:00 GMT 2022
Scope of Services and Specific Requirements South Campus Building SHPE The steel framing members have paint peeling and rust accumulating (to various degrees) throughout the space. These structural framing members need peeling paint and rust removed so the surfaces can be evaluated for structural integrity. If necessary, some of the framing members may need to be replaced.
Contractor shall work with the Town’s contractor to coordinate with the existing system(239-241-1171) • Paint all interior walls 90” in height from floor to match existing colors. • Prep/paint all I-beam steel structural members around exterior to a height of 4’ above ground level to match existing colors. • Remove all tree and trash within 75’ perimeter of building exterior • Push back any debris piles to allow room for parking and add temporary
, Primers, Sealers, etc. [005-630-56] Paint, House and Trim [005-630-66] Paints, Traffic [005-630-82] Sealers and Primers, Paint [005-635-43] Paint Equipment, Accessories and Supplies (Not Otherwise Classified) Show More
Contractor shall work with the Town’s contractor to coordinate with the existing system(239-241-1171) • Paint all interior walls 90” in height from floor to match existing colors. • Prep/paint all I-beam steel structural members around exterior to a height of 4’ above ground level to match existing colors. • Remove all tree and trash within 75’ perimeter of building exterior • Push back any debris piles to allow room for parking and add temporary
This project will include: The Abate existing asbestos and heavy metals paint. Repair existing crane rails and supporting structural members. Replace existing 5-ton manual hoists with new explosion-proof electrically operated cranes. Replace and upgrade electrical service to the building and all interior electrical systems, including explosion-proof electrical features in the assembly bays.
Abate existing asbestos and heavy metals paint. Repair existing crane rails and supporting structural members. Replace existing 5-ton manual hoists with new explosion-proof electrically operated cranes. Replace and upgrade electrical service to the building and all interior electrical systems, including explosion-proof electrical features in the assembly bays. Install new data and communications systems throughout the facility.