Type : Bid Notification
Asphalt Paving of Existing Gravel Parking Lot at Stone lake Public Access Site in LaPorte Co/DNR Bid Number:- ENG2201872270 Due Date:- 2/8/2022 1:31 PM
Asphalt Paving of Existing Gravel Parking Lot at Stone lake Public Access Site in LaPorte Co/DNR Bid Number:- ENG2201872270 Due Date:- 2/8/2022 1:31 PM
ENG2201872270 Stone Lake Public Access Site Asphalt Paving of existing gravel Parking Lot LaPorte County will be received from Contractors, holding a current Certificate of Qualification, at Department of Administration, Public Works Division Email Bid Box-publicworksbids@idoa.in.gov (note, do not cc: any other party) Subject line MUST contain Bid- ENG2201872270 Stone Lake Pubic
Stone Parking Lot Paving Category: Request For Quotes Status: Open Bid Recipient: Carol Brown, Purchasing @ Attleboro City Hall Description: REQUEST FOR QUOTES: Pave asphalt at parking lot extension adjacent to Pickleball Courts at Tilda B. Stone Parking Lot, 700 South Main Street, Attleboro, MA 02703 . SITE VISIT: Wednesday 6/14/23 at 9:30 or proof of site visit by pictures.
, material and equipment entering into the\nconstruction of:\nSamarcand Parking Improvements\nProject includes development of paved parking lot at the existing Training Center, as well as paving the\nexisting stone parking lot at the existing Gun Range.
and read for the furnishing of labor, material and equipment entering into the construction of: Samarcand Parking Improvements Project includes development of paved parking lot at the existing Training Center, as well as paving the existing stone parking lot at the existing Gun Range.
Weed Control of Surfaced Areas a Weed control of surfaced areas is to be included in the fixed contract price. b Sidewalks, patios, parking lots, curbing, and stone drip edges are to be kept free of weeds.
RECORDED BIDS AT TIME OF BID OPENING ARE ATTACHED - Attachment name: CONSTRUCT PARKING LOT Bldg 7000-Abstract Of Offers-PAGE 1 and CONSTRUCT PARKING LOT Bldg 7000-Abstract Of Offers-PAGE 2Project consists of, but is not limited to remove existing topsoil. Remove trees and stumps. Install parking lot LED lighting. Compact subbase. Construct asphalt parking lot with 10” crushed stone and 3” asphalt. Restripe adjacent parking lot for traffic flow.