Type : Bid Notification
The proposed work consists of retrofitting the approach and tunnel lighting system, restriping the roadway through the Mule Pass Tunnel, and related work.
The proposed work consists of retrofitting the approach and tunnel lighting system, restriping the roadway through the Mule Pass Tunnel, and related work.
Proposal C20799 Remove existing lighting from the US 550 Red Mtn Pass snow shed tunnel at MP 88.15. Replace with new LED lighting system. Proposal information tableDate Generated:01/10/2018Sections: 1 Date Revised: 01/10/2018 Amendments: 1 Call Order: 001 Highway Number: Items: 23 Counties: OURAY Project ID: NHPP5502-088 Not available for contractor viewing until 12/28/2017. Not yet available for contractor viewing.
PUBLIC IMPROVEMENT REQUEST FOR PROPOSAL RFP# 24-23 Barton/Bandemer Park Pedestrian Tunnel Project City of Ann Arbor PARKS AND RECREATION SERVICES/COMMUNITY SERVICES AREA Due Date: May 8, 2024 by 11:00a.m.(local time) Issued By: City of Ann Arbor Procurement Unit 301 E.
l’eau Direction de l’épuration des eaux usées Des soumissions, sont demandées et devront être reçues, avant 13 h 30, à la date ci-dessous, dans les locaux du Service du greffe situés dans l’édifice Lucien-Saulnier, 155, rue Notre-Dame Est, rez-de-chaussée, Montréal (Québec) H2Y 1B5 pour : Catégorie : Travaux de construction Appel d’offres : DEEU-IP-24010-168542-C Titre de l’appel d’offres : Mise à niveau de la station de pompage du tunnel
MTR 1 The washer/decontamination unit should consist of one or more corrosion-resistant chambers that are freestanding, recessed in a wall, or installed between walls (pass-through or tunnel washers that load on one side of a wall and unload on the other).
NY/NJ RFTF GOVERNMENT OWNED VEHICLES (GOV) EXPENSES/FEES FOR BRIDGES, ROADS, TUNNELS. EZ PASS -NY ACCOUNT NUMBER 67555885 OCTOBER 1, 2021- SEPTEMBER 30, 2022 ADDITIONAL FUNDING FOR TOLLS INCREASE AND... Solicitation ID/Procurement Identifier: 15M10321PA4700053 Ultimate Completion Date: Fri Sep 30 17:00:00 GMT 2022
These flood control structures include dam facilities with pass through tunnels and flood control gates. Many of these facilities are aging and inspection for degradation is required on a periodic basis.