Type : Bid Notification
The proposed work consists of retrofitting the approach and tunnel lighting system, restriping the roadway through the Mule Pass Tunnel, and related work.
The proposed work consists of retrofitting the approach and tunnel lighting system, restriping the roadway through the Mule Pass Tunnel, and related work.
Proposal C20799 Remove existing lighting from the US 550 Red Mtn Pass snow shed tunnel at MP 88.15. Replace with new LED lighting system. Proposal information tableDate Generated:01/10/2018Sections: 1 Date Revised: 01/10/2018 Amendments: 1 Call Order: 001 Highway Number: Items: 23 Counties: OURAY Project ID: NHPP5502-088 Not available for contractor viewing until 12/28/2017. Not yet available for contractor viewing.
Zip files CANNOT be sent. mailto:contracts.purchasing@dot.ohio.gov Invitation No. 180-24 4 ITB 180-24 Highway Lighting Materials April 5, 2023 REQUIREMENTS/SPECIFICATIONS Section 1: Intent The intent of this Invitation to Bid is to establish term contract pricing for common High-Pressure Sodium and Solid-State (LED) highway lighting replacement parts.
FRANKLIN COVEY ALL ACCESS PASS AND INSTRUCTOR LED TRAININGS Solicitation ID/Procurement Identifier: 9531CB24P0013 Ultimate Completion Date: Wed Jan 15 18:00:00 GMT 2025
Contract Name : Highway Lighting Materials Highway Lighting Materials Supplier : SUPREME LIGHTING DESIGN LLC Contract ID : CTR017728 State Contract Number : DOT18024-3 Contract Sub-Type: Single Agency Contract
Contract Name : Highway Lighting Materials Highway Lighting Materials Supplier : PATH MASTER INC Contract ID : CTR017727 State Contract Number : DOT18024-2 Contract Sub-Type: Single Agency Contract