  • Coal Creek Fish <b>Passage</b> Construction

    Coal Creek Fish Passage Construction

    Type : Bid Notification

    Due : 01 May, 2024 (Today)
    Posted : 25 days ago
    Started : 22 Mar, 2024 (1 month ago)

    Coal Creek Fish Passage Construction Project overview: Trout Unlimited is seeking a contractor to provide equipment, labor, and materials to remove a fish passage barrier culvert and one additional culvert from a private road crossing of Coal Creek. The crossing will be replaced with a 24-foot-long x 12’-6” wide, pre-engineered, and prefabricated concrete bridge planks, abutment wall, wingwalls, and bridge sills.

    From: Ben Franklin Transit (Transportation)

  • Rawson Creek Fish Passage – Phase 2.

    Type : Bid Notification

    Due : 14 May, 2024 (in 12 days)
    Posted : 12 days ago
    Started : 04 Apr, 2024 (27 days ago)

    A total of four large wood pieces with root wads will be placed at the crossing, two upstream of the crossing and two downstream of the crossing, to stabilize the bank and provide habitat enhancement features. 2.2 Time for Final Completion. The Project must be fully completed by November 1, 2024 with all instream work completed by October 15.

    From: Smith River Alliance (Utilities)

  • Whiteman Cove Fish Passage Restoration, Department of Natural Resources, Pierce County, WA

    Type : Bid Notification

    Due : 02 May, 2024 (Tomorrow)
    Posted : 19 days ago
    Started : 27 Mar, 2024 (1 month ago)

    Project #DNR129 Bid Date: 5/2/2024 @ 12:00 pm PDT Whiteman Cove Fish Passage Restoration, Department of Natural Resources, Pierce County, WA #24-E05 $4,341,650 Specs & Plans Register on this project. View self registered Bidders List Builders Exchange of Washington, Inc. Subs and Suppliers Owner: State of Washington Department of Natural Resources Engineering & General Services Division 1111 Washington St. SE, Third Floor P.O.

    From: Washington State Department of Natural Resources (State)

  • I-5 & SR 539, Baker Creek & Spring Creek – Fish Passage

    Type : Bid Notification

    Due : 22 May, 2024 (in 21 days)
    Posted : 2 months ago
    Started : 06 Feb, 2024 (2 months ago)

    Contract summary This project will replace five existing fish barrier culvert crossings at the following locations: (i) I-5 at Baker Creek & Spring Creek (milepost 255.76 to milepost 256.76) and (ii) SR 539 at Baker Creek (milepost 0.00 to 0.35).

    From: Washington Department of Transportation (Transportation)

  • Howard A. Hanson Dam AWSP Fish Passage Facility

    Type : Pre-Bid Notification

    Due : 28 May, 2024 (in 27 days)
    Posted : 2 months ago
    Started : 12 Feb, 2024 (2 months ago)

    Hanson (HAHD), Additional Water Storage Project (AWSP), Fish Passage Facility (FPF)The U.S. Army Corps of Engineers – Seattle District, has been tasked to solicit and award a construction contract for the HAHD AWSP FPF Project.

    From: Federal Government (Federal)

  • LOCK & DAM 22 FISH PASSAGE IMPROVEMENT PROJECT - UPPER MISSISIPPI RIVER MILE 301.2, SAVERTON, MO - RALLS COUNTY, MO AND PIKE COUNTY, IL

    Type : Pre-Bid Notification

    Due : 08 May, 2024 (in 7 days)
    Posted : 4 months ago
    Started : 22 Apr, 2024 (8 days ago)

    Army Corps of Engineers (USACE), Rock Island District, has a requirement for a Fish Passage at Lock and Dam 22 at Mile 301.2 Saverton, MO – Ralls County, MO and Pike County, IL for work to include but not limited to: demolition; construct a rock ramp fishway; concrete bridge; install ice and debris boom; sheet piling work, concrete work; earthwork; stone and boulder placement; access ramp work; building (with architectural materials) and deck erection

    From: Federal Government (Federal)

  • Lock & Dam 22 Fish Passage Improvement Project - Upper Mississippi River Mile 301.2, Saverton, MO - Ralls County, MO and Pike County, IL - DRAFT PLANS AN...

    Type : Bid Notification

    Due : 22 May, 2024 (in 21 days)
    Posted : 1 day ago
    Started : 29 Apr, 2024 (1 day ago)

    LOCK & DAM 22 FISH PASSAGE IMPROVEMENT PROJECT (LD22 FPIP)- UPPER MISSISIPPI RIVER MILE 301.2, SAVERTON, MO - RALLS COUNTY, MO AND PIKE COUNTY, IL - NAVIGATION ECOSYSTEM RESTORATION PROGRAM (NESP) - DRAFT PLANS AND SPECIFICATIONSThis announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or make a contract award.