Type : Bid Notification
Full width polymer modified hot bituminous pavement inlay Project NO:X-A004(544), 41052 Due Date: 10/17/2019 WebEx meeting
Full width polymer modified hot bituminous pavement inlay Project NO:X-A004(544), 41052 Due Date: 10/17/2019 WebEx meeting
Expected Construction Completion Date is 2024 -10- 31 Pavement rehabilitation (i.e. mill and inlay asphalt) on 26 St SE. The work includes concrete repairs, subgrade repairs if necessary, and all traffic accommodation. Contract duration The estimated contract period will be 5 month(s), with a proposed start date of 2024/06/01.
Grind Inlay Pavement Preservation and Striping on Interstate 5 from MP 28 to MP 27 in Jackson County, OregonShip-to Address:Bill-to Address:Print Format:Bid Print NewFile Attachments: Invitation to Bid~32.docx ATT A 35188 Specifications and Special Provisions.docx Bid Pricing Form.xls ATT B Site Maps.pdfForm Attachments:Required Quote Attachments Discipline Type:Public ImprovementProcurement Method:Competitive Sealed Bid
Grind and inlay base pavements as indicated in the statement of work and drawings. Remove 3 inches of asphalt paving by cold plane. Repave 3 inches of (ODOT half inch, Level 3 asphalt with PG 64-28 binder compacted to ODOT standards). NIGP Code: 913-96 Paving and Resurfacing, Streets, Major and Residential QtyUnit CostUOMTotal Discount Amt.Total Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging:
Opportunity Summary The purpose of this ITB is to establish a Contract for furnishing materials, equipment, labor, and performing work to construct an asphalt concrete pavement ("ACP") inlay from Kern Swamp Rd. MP 53.68 - Agate Street MP 58.67 on the Green Springs (OR66) in Klamath County.