Search results for: pavement rehabilitation and traffic

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 629
  • ROBERTS AVENUE AND SURF WAY <b>PAVEMENT</b> <b>REHABILITATION</b> PROJECT (35c1553)

    ROBERTS AVENUE AND SURF WAY PAVEMENT REHABILITATION PROJECT (35c1553)

    Type : Bid Notification

    Due : 30 Apr, 2024 (Today)
    Posted : 1 month ago
    Started : 25 Mar, 2024 (1 month ago)

    In general, the work consists of, but is not limited to, concrete sidewalk and curb and gutter repairs, clearing and grubbing, demolition and restoration of asphalt dike, pavement rehabilitation by way of full depth reclamation, excess material offhaul and placement of HMA, adjustments of utilities boxes, and installation of traffic markings and striping, including all necessary storm water protection and traffic control measures.

    From: Monterey (City)

  • 2024 Pavement Rehabilitation - 26 St SE

    Type : Bid Notification

    Due : 07 May, 2024 (in 7 days)
    Posted : 16 days ago
    Started : 12 Apr, 2024 (17 days ago)

    Expected Construction Completion Date is 2024 -10- 31 Pavement rehabilitation (i.e. mill and inlay asphalt) on 26 St SE. The work includes concrete repairs, subgrade repairs if necessary, and all traffic accommodation. Contract duration The estimated contract period will be 5 month(s), with a proposed start date of 2024/06/01.

    From: Canada (Federal)

  • 1st Avenue W from 6th St to 1st St Pavement Rehabilitation and Traffic Signal Improvements

    Type : Bid Notification

    Due : 02 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 12 Jan, 2022 (about 2 years ago)

    Type Request for Bid Status Issued Number 301987-03 Addendum 2 (1st Avenue W from 6th St to 1st St Pavement Rehabilitation and Traffic Signal Improvements) Issue Date & Time 1/12/2022 11:00:01 AM (CT) Close Date & Time 2/2/2022 11:00:00 AM (CT) Time Left1 hours 47 minutes 27 seconds Notes Project Description: 1st Avenue W from 6th Street to 1st Street Pavement Rehabilitation and Traffic Signal Improvements     Early Start Date: Upon

    From: City of Cedar Rapids (City)

  • RDS-FY24-0381 - San Tomas Expwy Pavement Rehab Project

    Type : Bid Notification

    Due : 09 May, 2024 (in 9 days)
    Posted : 9 days ago
    Started : 17 Apr, 2024 (12 days ago)

    & sidewalk replacement, ADA access improvements, removal and replacement of pavement markings and striping, new roadway signs, traffic signal modifications, install pedestrian sensors, removal and replacement of inductive traffic loops, and other details of work not mentioned above that are required by the Project Plans and these Special Provisions.

    From: Santa Clara (County)

  • San Tomas Expwy Pavement Rehab Project

    Type : Bid Notification

    Due : 09 May, 2024 (in 9 days)
    Posted : 7 days ago
    Started : 17 Apr, 2024 (12 days ago)

    (CIR), Hot Mix Asphalt overlay, pavement repairs, Portland cement concrete (PCC) curb, PCC curb & gutter, PCC curb ramp & sidewalk replacement, ADA access improvements, removal and replacement of pavement markings and striping, new roadway signs, traffic signal modifications, install pedestrian sensors, removal and replacement of inductive traffic loops, and other details of work not mentioned above that are required by the Project Plans and these

    From: County of Santa Clara (County)

  • Prairie Center Drive Pavement Rehabilitation Project

    Type : Bid Notification

    Due : 09 May, 2024 (in 9 days)
    Posted : 11 days ago
    Started : 03 Apr, 2024 (26 days ago)

    Description: Project Category Code:Manhole Rehabilitation, Street/Road Intersection Improvements, Traffic Control Devices (Signals, Signing, etc.), Aggregate, Sidewalks/Curbs/Gutters, Street/Road Pavement Marking, Asphalt Overlay, Rehab. and/or Maint., Street/Road Asphalt Milling, ADA Curb Ramps, Traffic Control, Revised Signal System, Traffic Control Signal Systems, Curbs, Asphalt Pulverizing, Paving (Highway, Road or Street) Solicitor Details Solicitor

    From: Eden Prairie (City)

  • for constructing the Pavement Rehabilitation (Micro-Milling, Resurfacing, and Traffic Stripe) on Lakeshore Parkway from the junction of Lea...

    Type : Bid Notification

    Due : 31 Jan, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 06 Jan, 2020 (about 4 years ago)

    Proposal 20200131051 for constructing the Pavement Rehabilitation (Micro-Milling, Resurfacing, and Traffic Stripe) on Lakeshore Parkway from the junction of Leaf Drive to the junction of Venice Road southeast of Wenonah. Length 1.987 mi.

    From: Alabama Department of Transportation (Transportation)