Search results for: payload project

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 50
  • DEPLHINUS PROTOTYPE PAYLOAD PROJECT

    Type : Bid Notification

    Due : 24 Oct, 2022 (18 months ago)
    Posted : 19 months ago
    Started : 08 Sep, 2022 (19 months ago)

    This project will be managed by a Naval Surface Warfare Center, Crane Division Project Manager. PROJECT OVERVIEWThe Government requires material designs that will require varying levels of modifications to mechanical design and housing, electrical design, modularity and integration, and hardening/ruggedization for a maritime application.

    From: Federal Government (Federal)

  • Request for Solutions: NEPTUNE PAYLOAD PROTOTYPE PROJECT

    Type : Bid Notification

    Due : 18 Jun, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 13 May, 2021 (about 2 years ago)

    This project will be managed by a Naval Surface Warfare Center, Crane Division Project Manager. 

    From: Federal Government (Federal)

  • Common Payload Interface Specification Project (CoPaIS)

    Type : Bid Notification

    Due : 30 Apr, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 25 Apr, 2018 (about 6 years ago)

     The Los Angeles Air Force Base (LAAFB), Space and Missile Systems Center (SMC), in support of the Common Payload Interface Specification (CoPaIS) Project, is seeking information regarding the extent to which an interested contractor could supply a suite of equipment and software to support a demonstration of a new satellite-to-payload command and data handling (C&DH) interface intended for all future SMC procured medium to large satellites.

    From: Federal Government (Federal)

  • NASA GSFC ROMAN SPACE TELESCOPE PROJECT INTEGRATED PAYLOAD ASSEMBLY VIBRATION ISOLATION SYSTEM

    Type : Bid Notification

    Due : 13 May, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 18 Apr, 2022 (about 2 years ago)

    Competitive RFP 80GSFC22R0036 for Roman IPA VIS EffortAmendment #1 provides for an extension to the proposal due date to Friday, May 13, 2022.

    From: Federal Government (Federal)

  • VCSFA RFP #24.130300-001-27 Payload Processing Facility (PPF) High Bay Door RF Shield

    Type : Bid Notification

    Due : 01 Mar, 2024 (1 month ago)
    Posted : 2 months ago
    Started : 08 Feb, 2024 (2 months ago)

    The project includes assessing the PPF High Bay Door and developing a detailed design plan that meets applicable industry standards and regulations. The project is located at the Mid-Atlantic Regional Spaceport (MARS) NASA Wallops Flight Facility, Wallops Island, VA.

    From: Virginia (State)

  • GLOBAL HAWK SKYRANGE PAYLOAD ENGINEERING SUPPORT

    Type : Bid Notification

    Due : 22 Feb, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 16 Feb, 2021 (about 3 years ago)

    This experience of the specialized payload system that has been installed in the NASA aircraft and the ground control station and the familiarity with the different sensor project payloads being tasked to the NASA Global Hawk Project is unique and would take time to replace.

    From: Federal Government (Federal)

  • NASA GSFC ROMAN SPACE TELESCOPE PROJECT INTEGRATED PAYLOAD ASSEMBLY VIBRATION ISOLATION SYSTEM

    Type : Pre-Bid Notification

    Due : 31 Dec, 2022 (16 months ago)
    Posted : about 2 years ago
    Started : 18 Feb, 2022 (about 2 years ago)

    NASA/GSFC has a new requirement for an Integrated Payload Assembly (IPA) TVAC Test Vibration Isolation System (VIS) for the Roman Space Telescope Project.Roman Space Telescope is a NASA observatory designed to perform wide-field imaging and slitless spectroscopic surveys of the near infrared (NIR) sky for the community as well as direct imaging of exoplanets and debris disks using a coronagraph.

    From: Federal Government (Federal)