Search results for: pecos road

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 267
  • Pecos Road Rehabilitation

    Type : Bid Notification

    Due : 15 Jun, 2022 (22 months ago)
    Posted : 23 months ago
    Started : 23 May, 2022 (23 months ago)

    This project involves removal and replacement of asphalt concrete on Pecos Road between I 215 and Windmill Parkway in Henderson, Nevada, including associated sidewalk ramp replacements, roadway striping, and utility adjustments. It also includes installation of a left turn lane on Galleria Drive at Angelica Peak Street.

    From: Southern Nevada Regional Housing Authority (State)

  • Pecos Road - I-215 Trail Bridge

    Type : Bid Notification

    Due : 03 Nov, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 23 Sep, 2020 (about 3 years ago)

    This project shall consist of, but not be limited to, the construction of a pedestrian bridge across Pecos Road at I-215, a 12-foot wide paved asphalt multi-use trail, 6-foot chain link fencing, decorative landscape rock and other associated appurtenances.

    From: Southern Nevada Regional Housing Authority (State)

  • Pipeline Installation In Hacienda Avenue and Pecos Road

    Type : Bid Notification

    Due : 25 Feb, 2020 (about 4 years ago)
    Posted : about 4 years ago
    Started : 03 Feb, 2020 (about 4 years ago)

    Las Vegas Valley Water District invites qualified firms individuals (Bidders) to submit Bids for the following work: The Work is located within the existing right-of-way of Pecos Road between Tropicana Avenue and Hacienda Avenue, and within the existing right-of-way of Casey Drive between Topaz Street and McLeod Drive.

    From: Southern Nevada Regional Housing Authority (State)

  • Arizona Avenue Improvements - Frye Road to Pecos Road

    Type : Bid Notification

    Due : 15 Nov, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 31 Oct, 2017 (about 6 years ago)

    : Arizona Avenue Improvements - Frye Road to Pecos Road; Project No: ST1607.401; Engineers Estimate: $6,471,888; Bid Due Date & Time: November 15, 2017 - 3:00 p.m. local Arizona time. Questions Due: November 6, 2017 - 5:00 p.m. local Arizona time. Mandatory Pre-Bid Conference: October 31, 2017 at 9:00 a.m. local Arizona time,3rd Floor Purchasing Conference Room, 175 S. Arizona Ave., 85225.

    From: Chandler (City)

  • CC215 SOUTH BRUCE WOODBURY BELTWAY WINDMILL LANE TO PECOS ROAD

    Type : Bid Notification

    Due : 12 Nov, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 14 Oct, 2019 (about 4 years ago)

    The work to be performed under this Contract is for the construction necessary for widening of the CC 215 South Bruce Woodbury Beltway from Windmill Lane to Pecos Road, including removal of existing improvements; construction and widening of four existing bridge structures, mainline concrete paving and concrete paving repairs; plantmix bituminous surfacing; drainage facilities; concrete barrier rail; signage; pavement markings; sound and retaining

    From: Southern Nevada Regional Housing Authority (State)

  • CC215 SOUTH BRUCE WOODBURY BELTWAY WINDMILL LANE TO PECOS ROAD

    Type : Bid Notification

    Due : 21 Nov, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 14 Oct, 2019 (about 4 years ago)

    The work to be performed under this Contract is for the construction necessary for widening of the CC 215 South Bruce Woodbury Beltway from Windmill Lane to Pecos Road, including removal of existing improvements; construction and widening of four existing bridge structures, mainline concrete paving and concrete paving repairs; plantmix bituminous surfacing; drainage facilities; concrete barrier rail; signage; pavement markings; sound and retaining

    From: Southern Nevada Regional Housing Authority (State)

  • City of Chandler Arizona Avenue Improvements - Frye Road to Pecos Road

    Type : Bid Notification

    Due : 15 Nov, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 18 Oct, 2017 (about 6 years ago)

    Engineers Estimate: $6,461,052 NIGP Code: 912-23 Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc.) QtyUnit CostUOMTotal Discount Amt.Tax RateTax AmountTotal Cost 1.0 EA - Each Manufacturer: Brand: Model: Make: Packaging: Counties Requiring Service: Item # 1: ( 912 - 23 ) Invitation for Bid City of Chandler Arizona Avenue Improvements - Frye Road to Pecos Road ; ST1607.401.

    From: Arizona (State)