Search results for: pedestrian and roadway modifications

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 97
  • Terminal Roadway Modifications for RSW Terminal Expansion Phase II

    Type : Bid Notification

    Due : 14 May, 2024 (in 9 days)
    Posted : 1 month ago
    Started : 25 Mar, 2024 (1 month ago)

    This project consists of the widening and reconfiguration of Terminal Access Road arrival and departure levels. The Project also includes in-filling portions of the departure level bridge deck, and reconstructing the 2nd level pedestrian walkway bridges. Other infrastructure improvements include demolition, asphalt paving, grading, structural concrete, drainage, utilities, lighting, security, milling, pavement markings, landscaping, and MOT.

    From: Southwest Florida International Airport (Airport)

  • Terminal Roadway Modifications for RSW Terminal Expansion Phase II

    Type : Bid Notification

    Due : 21 May, 2024 (in 16 days)
    Posted : 4 days ago
    Started : 25 Mar, 2024 (1 month ago)

    This project consists of the widening and reconfiguration of Terminal Access Road arrival and departure levels. The Project also includes in-filling portions of the departure level bridge deck, and reconstructing the 2nd level pedestrian walkway bridges. Other infrastructure improvements include demolition, asphalt paving, grading, structural concrete, drainage, utilities, lighting, security, milling, pavement markings, landscaping, and MOT.

    From: Southwest Florida International Airport (Airport)

  • 6TH AVENUE PEDESTRIAN AND ROADWAY MODIFICATIONS

    Type : Bid Notification

    Due : 17 Aug, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 08 Jul, 2021 (about 2 years ago)

    The work on this project consists of furnishing all labor, equipment and materials for the construction of a new concretes curb and gutter, stand alone curbed islands, mid-block crossing, pavement markings and ADA ramp reconstruction along 6th Avenue between Gadsden Street and Marion Avenue.

    From: Tallahassee (City)

  • Independence Blvd. - Columbus Street Pedestrian Improvements

    Type : Bid Notification

    Due : 03 Oct, 2023 (7 months ago)
    Posted : 8 months ago
    Started : 21 Aug, 2023 (8 months ago)

    pedestrian signals, as well as sidewalk and roadway modifications Additional Registration (NEW) NONE Scope of Work removing pavements, pedestrian refuge island, high visibility crosswalks, ADA ramps, pedestrian signals, as well as sidewalk and roadway modifications Documents Download all documents Filename Type Date Modified Status Notice of ITB Attachment Aug 21, 2023 Complete Distribution Info Bid Bond None Plan (blueprint) Agency distributing

    From: City of Virginia Beach (City)

  • Walnut Hill Road (Rt. 115) and Cumberland Road (Rt. 9) Pedestrian Improvements

    Type : Bid Notification

    Due : 28 Mar, 2023 (13 months ago)
    Posted : 14 months ago
    Started : 13 Mar, 2023 (13 months ago)

    PROJECT Work under this project consists of installation of approximately 800 linear feet of 12’ and 15” SICPE drainage pipe, 9 catch basins, 680 linear feet of 5’ wide paved sidewalk with concrete curb, concrete roadway modifications and associated signage, grading, and restoration of lawns and paved areas, including erosion control, traffic control, and providing all materials, equipment, and labor to provide a complete project.

    From: Town of North Yarmouth (Town)

  • Walnut Hill Road (Rt. 115) and Cumberland Road (Rt. 9) Pedestrian Improvements

    Type : Bid Notification

    Due : 28 Mar, 2023 (13 months ago)
    Posted : 14 months ago
    Started : 13 Mar, 2023 (13 months ago)

    PROJECT Work under this project consists of installation of approximately 800 linear feet of 12’ and 15” SICPE drainage pipe, 9 catch basins, 680 linear feet of 5’ wide paved sidewalk with concrete curb, concrete roadway modifications and associated signage, grading, and restoration of lawns and paved areas, including erosion control, traffic control, and providing all materials, equipment, and labor to provide a complete project.

    From: North Yarmouth (Town)

  • Driftway Roadway Improvements Project

    Type : Bid Notification

    Due : 02 Sep, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 05 Aug, 2020 (about 3 years ago)

    In general, the work of this project includes 560 LF of complete streets roadway modifications to improve pedestrian conditions and parking on Driftway in Salisbury, MA. Roadway improvements include new curb and sidewalks along both sides of driftway, pavement mill & overlay, drainage modifications, a rain garden, minor landscaping, pavement markings, signing, and other incidental items.

    From: Massachusetts (State)