Type : Bid Notification
Boedecker Pedestrian Bridge Crossing Location Colorado Publication Date 09/25/2019 Closing Date 10/17/2019 02:00 PM MDT
Boedecker Pedestrian Bridge Crossing Location Colorado Publication Date 09/25/2019 Closing Date 10/17/2019 02:00 PM MDT
“Pedestrian Bridge Crossing Repairs – Garden Street” Bid # 24-B-012/LR and returned to: City of Titusville – City Hall Purchasing and Contracting Department 555 S. Washington Ave., 2 nd flr.
Assessment for a New Pedestrian Bridge Crossing at John Counter Blvd & CN Rail LineF18-TPW-TS-2022-04No. 2 (Addendum 2)Detail: Addendum 2 Professional Engineering Services - Environmental Assessment for a New Pedestrian Bridge Crossing at John Counter Blvd & CN Rail LineF18-TPW-TS-2022-04No. 1 (Addendum 1)Detail: Addendum 1
Completion Date:Sept. 15, 2024 Description: Project Category Code:Bridge (Replacement or Rehabilitation), Pedestrian Improvements Solicitor Details Solicitor Name:Sioux City IA, City ofDesign Discipline:Soliciting agentAddress:405 6th Street, Sioux City, IA - 51101 Phone:712-279-6236Contact:Ann Marie SkaggsEmail: annskaggs@sioux-city.org
Work involves engineering, procurement and installation of a prefabricated steel half-through truss bridge structure over Thomas Creek on the Tsleil-Waututh Nation reserve. Contract duration Refer to the description above for full details.
The City of Richmond is accepting bids for the construction of the Canal Walk Improvements - Phase II (UPC No. 113492) project to provide general contracting services that include, but are not limited to the construction of a ramp extension from an existing accessible ramp on the south side of the canal at the pedestrian bridge crossing near the 15th Street and Dock Street intersection.
The work consists of, but is not necessarily limited to, the construction of a new 135-foot pedestrian bridge crossing over the outfall of the Friant-Kern Canal and within the Kern River floodplain, the construction of a golf cart path undercrossing adjacent to the Riverlakes Golf Course, and the construction of a 75 foot pedestrian bridge crossing adjacent to Madison Grove Park.