Search results for: pedestrian bridge improvement

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 8 of 8
  • Construction Management

    Type : Bid Notification

    Due : 07 May, 2024 (in 11 days)
    Posted : 7 days ago
    Started : 17 Apr, 2024 (8 days ago)

    In accordance with the Town’s Procurement Code, the Town will accept sealed Proposals for the Services specified in the Scope of Work.BackgroundThe Golden Eagle Impoundment project generally consists of pedestrian bridge construction, drainage channel improvements, Sediment drop basin construction, floodwall construction, irrigation relocation, landscaping and other miscellaneous work as required.

    From: Fountain Hills (Town)

  • CSP - Construction of a Pedestrian Bridge and Various Park Improvements at Eisenhower Park and Deussen Park for Harris County Precinct 1 (E...

    Type : Bid Notification

    Due : 22 Apr, 2024 (3 days ago)
    Posted : 1 month ago
    Started : 08 Mar, 2024 (1 month ago)

    Project: CSP - Construction of a Pedestrian Bridge and Various Park Improvements at Eisenhower Park and Deussen Park for Harris County Precinct 1 (Estimated Budget $22,000,000) Ref. #: 24/0090 Type: CSP Status: Open Open Date: Mar 8th 2024, 11:00 AM CST Questions Due Date: Mar 22nd 2024, 12:00 PM CDT Contact Information: Jared Abbey, Jared.abbey@pur.hctx.net Close Date: Apr 22nd 2024, 2

    From: Harris (County)

  • On-Site and Off-Site Infrastructure

    Type : Bid Notification

    Due : 23 May, 2024 (in 27 days)
    Posted : 7 days ago
    Started : 03 Apr, 2024 (22 days ago)

    including clearing, site and roadway grading, drainage culverts, rock removal, water, sewer, communications, electrical, water quality, stream and wetland mitigation, roadway pavement & roadway shoulder construction, traffic control, lighting, pedestrian bridges, utility support building and pad, and other miscellaneous improvements at the Multi-Agency Law Enforcement Training Academy, Nashville TN.

    From: Tennessee (State)

  • UNK University Residence North & South Demolition-14325

    Type : Bid Notification

    Due : N/A
    Posted : 9 days ago
    Started : 01 Apr, 2024 (24 days ago)

    Base bid includes demolition of the two buildings, foundation removals, utility abandonment, site sidewalks, and University Drive pedestrian crossing improvements adjacent to the canal bridge. Alternate 1 includes a new bike path along the south side University Drive and associated lighting from the canal to the west side of the URS property.

    From: University of Nebraska (Higher Education)

  • RFP 2024-02 EOR Phase 1 &2 CMAR

    Type : Bid Notification

    Due : N/A
    Posted : 1 month ago
    Started : 03 Mar, 2024 (1 month ago)

    Figure 1- Location Map Phase 1 Construction The Village of Estero’s consultants are currently working to complete the design and permitting of the proposed Phase 1 improvements on the property. The Phase 1 improvements include a walking path, pedestrian bridge over the Estero River, a restroom building, parking lot, landscaping, irrigation and utilities. Copies of the construction plans and permits have been attached.

    From: Estero (Village)