Search results for: penstock

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 5 of 5
  • Construction Contract #2023-09- French Meadows Penstock Interior Relining Project

    Type : Bid Notification

    Due : 30 May, 2024 (in 1 month)
    Posted : 18 months ago
    Started : 17 Nov, 2023 (5 months ago)

    In accordance performance specifications prepared by HDR Engineering Inc., the Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of the interior relining of the691 foot long, 6’-3” outside diameter carbon steel penstock pipe and spiral case at PCWA’s French Meadows Powerhouse

    From: Placer County Water Agency (Utilities)

  • RFQ #2023-09 - French Meadows PenstockInterior Relining Project

    Type : Bid Notification

    Due : 30 May, 2024 (in 1 month)
    Posted : 1 day ago
    Started : 08 Apr, 2024 (16 days ago)

    In accordance performance specifications prepared by HDR Engineering Inc., the Work includes the furnishing of all labor, materials, tax, equipment and services for the construction and completion of the interior relining of the 691 foot long, 6’-3” outside diameter carbon steel penstock pipe and spiral case at PCWA’s French Meadows Powerhouse

    From: Placer County Water Agency (Utilities)

  • Construction of Renewable Power Generation and Evacuation System in Vanuatu

    Type : Bid Notification

    Due : 18 Apr, 2024 (7 days ago)
    Posted : 22 days ago
    Started : 18 Apr, 2024 (7 days ago)

    Lot 2: Nambaranguit Site · Construction of approximately 3,493W hydroelectric generation system with 3 identical units of 1.75kW Pelton-type turbines (1,164W per turbine) installed in the Powerhouse. The turbines are required to have a total flow rate of 10.4 l/s with a total combined output of 3,493W (1,164W per turbine).

    From: United Nations Development Programme (State)