Search results for: photovoltaic and battery

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 261
  • Installation of Photovoltaic Microgrid with Battery Storage- Juana Diaz, Puerto Rico

    Type : Pre-Bid Notification

    Due : 30 Sep, 2024 (in 5 months)
    Posted : 3 months ago
    Started : 16 Jan, 2024 (3 months ago)

    The microgrid system will incorporate: a 690kW (minimum) non-tracking, new carport structure(s) (with the option to expand, as necessary, a ground-mount system to adjacent green spaces, and/or expand to other potential use sites identified on the Site Plan), Photovoltaic (PV) solar array, a 570kWh/140kW Battery Energy Storage System (BESS), a 275kW Tier 4 compliant peak shaving diesel generator, and a 2,000 gallon fuel tank.

    From: Federal Government (Federal)

  • Design and installation of a standalone Photovoltaic installation with battery storage No. 19Z11520Q0002

    Type : Bid Notification

    Due : 23 Dec, 2019 (about 4 years ago)
    Posted : about 4 years ago
    Started : 16 Dec, 2019 (about 4 years ago)

    The United States Department of State (DOS) Bureau of Overseas Buildings Operations (OBO) requires services to provide a photovoltaic and battery installation and microgrid located at five (5) residential properties in Harare Zimbabwe. This work will include Design and installation of a standalone photovoltaic installation with battery storage that integrates to the utility and existing diesel generator on each property.

    From: Federal Government (Federal)

  • DESIGN-BUILD SOLAR PHOTOVOLTAIC WITH BATTERY ENERGY STORAGE STOCKTON CAMPUS

    Type : Bid Notification

    Due : 04 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 20 Jan, 2022 (about 2 years ago)

    Project Title DESIGN-BUILD SOLAR PHOTOVOLTAIC WITH BATTERY ENERGY STORAGE STOCKTON CAMPUS Invitation # RFP# 2022-01 Bid Posting Date 01/20/2022 8:28 AM (PDT) Project Stage Bidding Bid Due Date 04/04/2022 2:00 PM (PDT) Response Format Electronic Project Type RFP (Request for Proposal) Response Types Response File Required RFP Documents (required) Type of Award Lump Sum Categories 10 - Professional Service License Requirements Department Purchasing

    From: San Joaquin Delta College (Higher Education)

  • Masten utility-interactive solar photovoltaic (PV) system with battery backup

    Type : Bid Notification

    Due : 01 Oct, 2021 (about 2 years ago)
    Posted : about 2 years ago
    Started : 01 Sep, 2021 (about 2 years ago)

    from a qualified contractor/vendor to design, fabricate, deliver, install, operate, and maintain a ground or carport utility-interactive solar photovoltaic (PV) system with battery backup.

    From: San Jose (City)

  • DESIGN, FURNISH, INSTALL, AND MAINTAIN A PHOTOVOLTAIC SYSTEM WITH BATTERY STORAGE FOR THE RONALD TY MOON JUDICIARY COMPLEX IN KAPOLEI

    Type : Bid Notification

    Due : 06 Jun, 2022 (23 months ago)
    Posted : about 2 years ago
    Started : 11 Apr, 2022 (about 2 years ago)

    panels 334413 Photovoltaic cells manufacturing 334413 Photovoltaic devices, solid-state, manufacturing 335999 Photovoltaic panels made from purchased cells Buyer Name Tritia L Cruz Buyer Phone (808) 538-5805 (808) 538-5805 Buyer Email tritia.l.cruz@courts.hawaii.gov Department Judiciary Division Contracts and Purchasing Office Contact Name Dee Dee Letts

    From: Hawaii (State)

  • Solar Photovoltaic and Battery Energy Storage System at Bachman Recreation Center

    Type : Bid Notification

    Due : 24 Feb, 2023 (14 months ago)
    Posted : 15 months ago
    Started : 18 Jan, 2023 (15 months ago)

    Project: Solar Photovoltaic and Battery Energy Storage System at Bachman Recreation Center Ref. #: CIZ22-BSD-2088 Type: RFP Status: Open Open Date: Jan 18th 2023, 8:00 AM CST Questions Due Date: Feb 14th 2023, 5:00 PM CST Close Date: Feb 24th 2023, 1:00 PM CST Days Left: < 1 Project Description:Request for Proposals for design and construction of a Solar Photovoltaic (PV) and Battery Energy Storage System (BESS) Project at Bachman Recreation Center

    From: City of Dallas (City)

  • RFP #2324-31 Solar Photovoltaic & Battery Energy Storage Systems Project

    Type : Bid Notification

    Due : 17 Nov, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 10 Oct, 2023 (6 months ago)

    Project Title RFP #2324-31 Solar Photovoltaic & Battery Energy Storage Systems Project Invitation # 2324-31 Bid Posting Date 10/10/2023 6:34 AM (PST) Project Stage Bidding Bid Due Date 11/17/2023 12:00 PM (PST) Response Format Electronic Project Type RFP (Request for Proposal) Response Types Response File Type of Award Lump Sum Categories 2100 - Contractor - Construction Services 2175 - Contractor - Electrical Installation 2225 - Contractor - General

    From: Long Beach Unified School (School)