Type : Pre-Bid Notification
The microgrid system will incorporate: a 690kW (minimum) non-tracking, new carport structure(s) (with the option to expand, as necessary, a ground-mount system to adjacent green spaces, and/or expand to other potential use sites identified on the Site Plan), Photovoltaic (PV) solar array, a 570kWh/140kW Battery Energy Storage System (BESS), a 275kW Tier 4 compliant peak shaving diesel generator, and a 2,000 gallon fuel tank.