Type : Bid Notification
Repairs are needed to the pile dike system to prevent the loss of its intended functions that could result in detrimental impacts to reliable navigation.DESCRIPTION OF REPAIR WORKFor 13 of the 15 pile dikes, the majority of the dike repair length will be replaced with enhanced enrockment that extends from the offshore end to 25 feet shoreward of existing +1.0 foot elevation (NAVD88).