Search results for: pipe fabrication

Showing opportunity 1 - 10 of 13
  • REPAIRING AND PAINTING OF SWITCHBOARDS IN <b>FABRICATION</b> BAY AND <b>PIPE</b> SHOP AT SSD AREA

    REPAIRING AND PAINTING OF SWITCHBOARDS IN FABRICATION BAY AND PIPE SHOP AT SSD AREA

    Type : Contract

    Due : 29 Apr, 2024 (in 9 days)
    Posted : 1 day ago
    Started : 03 Apr, 2024 (16 days ago)

    BAY AND PIPE SHOP AT SSD AREAWork DescriptionREPAIRING AND PAINTING OF SWITCHBOARDS IN FABRICATION BAY AND PIPE SHOP AT SSD AREANDA/Pre QualificationAS PER TENDER DOCUMENTIndependent External Monitor/RemarksNATender Value in ₹ 6,00,000 Product CategoryElectrical Works Sub categoryNA Contract TypeTenderBid Validity(Days)90Period Of Work(Days)67 LocationCSL/COCHINPincode682015 Pre Bid Meeting PlaceCOCHIN Pre Bid Meeting AddressEM-2 SECTION, U AND M

    From: Cochin Shipyard Limited (Federal)

  • Aluminum <b>Pipe</b> with Aluminum Structural Plate Headwalls Appomattox County

    Aluminum Pipe with Aluminum Structural Plate Headwalls Appomattox County

    Type : Award

    Due : 18 Mar, 2024 (1 month ago)
    Posted : 1 month ago
    Started : 13 Mar, 2024 (1 month ago)

    Well Casing Pipe) Quantity: 1.00000 each Delivery Date: Bid Tab Intent Award No Award Description: bid tab Posted On: 3/18/24 Grid:ItemSupplierDescriptionBid DetailsAmount1:I1_1Heritage Home Center dba Cahill, Inc.Aluminum Pipe with Aluminum Structural Plate Headwalls – Fabrication and delivery to Route 630 in Appomattox County, Virginia.

    From: Virginia (State)

  • Floor & Decor-Pensacola, FL

    Type : Bid Notification

    Due : 23 Apr, 2024 (in 3 days)
    Posted : 11 hours ago
    Started : 01 Apr, 2024 (18 days ago)

    , Stairs, Bollards, Pipe and Tube Railings, Metal Deck, Cold-Formed Steel Framing, HandrailsDivision 6 Wood and Plastics: Rough & Finish Carpentry, SheathingDivision 7 Thermal and Moisture Protection: Bituminous Damp proofing, Thermal Insulation, Roofing Penetrations, Roof Specialties, Roof Accessories, Penetration Firestopping, Joint Firestopping, Fire-Resistive Joint Systems, Joint Sealants, Commercial-Density SFRM, EIFS, G.C.

    From: Gleeson Constructors (Co-op)

  • Labor, materials & equipment necessary to replace three (3) restroom roofs located at Lafreniere Park

    Type : Bid Notification

    Due : 23 Apr, 2024 (in 3 days)
    Posted : 23 days ago
    Started : 27 Mar, 2024 (23 days ago)

    All roof curbs Page 9 of 28 flashings and pipe boots are the responsibility the roofer to install.

    From: Louisiana (State)

  • RFP - Home Repair Program

    Type : Bid Notification

    Due : 23 Apr, 2024 (in 3 days)
    Posted : 27 days ago
    Started : 20 Mar, 2024 (1 month ago)

    All roof curbs Page 9 of 28 flashings and pipe boots are the responsibility the roofer to install.

    From: Louisiana (State)

  • S Pebble Beach Ct Drainage

    Type : Bid Notification

    Due : 23 Apr, 2024 (in 3 days)
    Posted : 27 days ago
    Started : 22 Mar, 2024 (28 days ago)

    All roof curbs Page 9 of 28 flashings and pipe boots are the responsibility the roofer to install.

    From: Louisiana (State)

  • ON-CALL EMERGENCY WELDING/METAL FABRICATION SERVICES (218261-002)

    Type : Bid Notification

    Due : 31 Oct, 2024 (in 6 months)
    Posted : 11 hours ago
    Started : 04 Apr, 2024 (15 days ago)

    Angle Sheering - 6" x6" xK" Cold sawing, tube bending, Pipe bending, flame Cutting, Plasma cutting. Metal Fabrication- security gates, railings, metal cabinetwork, scaffolds, bins, hoods, chutes. Article IV 4001.1 -Guarantee The contractor shall guarantee all workmanship and parts furnished and installed under this contract against defect for (1) year beginning after the acceptance by the County, including all labor, parts and travel time.

    From: Erie (County)