Type : Contract
PIPE INSULATION & REPAIR - 65 LAVATORIES Solicitation ID/Procurement Identifier: 36C26224Q0615 Ultimate Completion Date: Mon Mar 31 17:00:00 GMT 2025
PIPE INSULATION & REPAIR - 65 LAVATORIES Solicitation ID/Procurement Identifier: 36C26224Q0615 Ultimate Completion Date: Mon Mar 31 17:00:00 GMT 2025
CONTRACTOR MUST PROVIDE BOILER FLUE PIPE INSULATION INSTALLATION AT THE NAVY HILL COMPLEX, SOUTH BUILDING LOCATED, 2423 E ST., NW., WASHINGTON, DC. Solicitation ID/Procurement Identifier: 47PD0322A0003 Ultimate Completion Date: Mon May 27 17:00:00 GMT 2024
Water Treatment Plant:Location: 2300 Great Oaks Drive, Round Rock, TX 78681.Proposed Improvements: Install pipe insulation and heat tracing at the Membrane Feed Pump Station. Install pipe insulation and heat tracing at the Recycle Pump Station. Well Sites:Location: Atumn Ln, Round Rock, TX 78681 (30.525982, -97.706815).Proposed improvements: Install pipe insulation and heat tracing at Well Nos.3, 5 and 6.
The abatement work includes the removal of designated ACM floor tile, floor tile mastic, ceiling plaster, and pipe fitting insulation from the basement mainframe room at the Lake County Administrative and Courts Complex. ACM ceiling plaster will also be removed in the G27 stairwell. Abatement in the mainframe room will be completed before the G27 stairwell and adjacent storage room.
REMOVE ACM PIPES INSULATION AND REINSULATE, WORK IS LOCATED AT US COURTHOUSE (IA0087ZZ),320 6TH ST., SIOUX CITY, IA 51101.(GENERAL SERVICES ADMINISTRATION). Solicitation ID/Procurement Identifier: 47PG0424Q9978 Ultimate Completion Date: Tue Jun 25 17:00:00 GMT 2024
Asbestos may be present in the existing flooring mastic and is present in some pipe insulation, and the City has retained an asbestos abatement contractor to perform any needed pipe insulation abatement work. That abatement work is NOT included in the work under this contract, although the Contractor will be required to coordinate their work with the City’s abatement contractor.
handlers and pneumatic control valves for judge’s chambers and support staff area and install one new air handler; 5.) demolition of old pipe insulation with install of new pipe insulation to accommodate new air handler location; 6.) installation of new ceiling panels to include grid, tile, LED lights, and return air vents for the HVAC system; 7.) reconfiguration of all lighting in the main office, storage, sitting, and new office areas; 8.) reconfiguration