Search results for: pipe insulation

Showing opportunity 1 - 10 of 32
  • <b>PIPE</b> <b>INSULATION</b> & REPAIR - 65 LAVATORIES

    PIPE INSULATION & REPAIR - 65 LAVATORIES

    Type : Contract

    Due : 31 Mar, 2025 (in 11 months)
    Posted : 1 month ago
    Started : 01 Apr, 2024 (1 month ago)

    PIPE INSULATION & REPAIR - 65 LAVATORIES Solicitation ID/Procurement Identifier: 36C26224Q0615 Ultimate Completion Date: Mon Mar 31 17:00:00 GMT 2025

    From: Federal Procurement Data System (Federal)

  • CONTRACTOR MUST PROVIDE BOILER FLUE <b>PIPE</b> <b>INSULATION</b> INSTALLATION AT THE NAVY HILL COMPLEX, SOUTH BUILDING LOCATED, 2423 E ST., NW., WASHINGTON, DC.

    CONTRACTOR MUST PROVIDE BOILER FLUE PIPE INSULATION INSTALLATION AT THE NAVY HILL COMPLEX, SOUTH BUILDING LOCATED, 2423 E ST., NW., WASHINGTON, DC...

    Type : Contract

    Due : 27 May, 2024 (in 24 days)
    Posted : 1 month ago
    Started : 22 Mar, 2024 (1 month ago)

    CONTRACTOR MUST PROVIDE BOILER FLUE PIPE INSULATION INSTALLATION AT THE NAVY HILL COMPLEX, SOUTH BUILDING LOCATED, 2423 E ST., NW., WASHINGTON, DC. Solicitation ID/Procurement Identifier: 47PD0322A0003 Ultimate Completion Date: Mon May 27 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • BCMUD Winterization and Electrical Improvements

    Type : Bid Notification

    Due : 22 May, 2024 (in 18 days)
    Posted : 1 day ago
    Started : 17 Apr, 2024 (16 days ago)

    Water Treatment Plant:Location: 2300 Great Oaks Drive, Round Rock, TX 78681.Proposed Improvements: Install pipe insulation and heat tracing at the Membrane Feed Pump Station. Install pipe insulation and heat tracing at the Recycle Pump Station. Well Sites:Location: Atumn Ln, Round Rock, TX 78681 (30.525982, -97.706815).Proposed improvements: Install pipe insulation and heat tracing at Well Nos.3, 5 and 6.

    From: Brushy Creek Municipal Utility District (Utilities)

  • Asbestos Abatement for Lake County Administrative and Courts Complex

    Type : Bid Notification

    Due : 23 May, 2024 (in 19 days)
    Posted : 16 minutes ago
    Started : 02 May, 2024 (Yesterday)

    The abatement work includes the removal of designated ACM floor tile, floor tile mastic, ceiling plaster, and pipe fitting insulation from the basement mainframe room at the Lake County Administrative and Courts Complex. ACM ceiling plaster will also be removed in the G27 stairwell. Abatement in the mainframe room will be completed before the G27 stairwell and adjacent storage room.

    From: Lake (County)

  • REMOVE ACM <b>PIPES</b> <b>INSULATION</b> AND REINSULATE, WORK IS LOCATED AT US COURTHOUSE (IA0087ZZ),320 6TH ST., SIOUX CITY, IA 51101.(GENERAL SERVICES ADMINISTRATION).

    REMOVE ACM PIPES INSULATION AND REINSULATE, WORK IS LOCATED AT US COURTHOUSE (IA0087ZZ),320 6TH ST., SIOUX CITY, IA 51101.(GENERAL SERVICES ADMINI...

    Type : Contract

    Due : 25 Jun, 2024 (in 1 month)
    Posted : 1 month ago
    Started : 25 Mar, 2024 (1 month ago)

    REMOVE ACM PIPES INSULATION AND REINSULATE, WORK IS LOCATED AT US COURTHOUSE (IA0087ZZ),320 6TH ST., SIOUX CITY, IA 51101.(GENERAL SERVICES ADMINISTRATION). Solicitation ID/Procurement Identifier: 47PG0424Q9978 Ultimate Completion Date: Tue Jun 25 17:00:00 GMT 2024

    From: Federal Procurement Data System (Federal)

  • City of La Crosse Emergency Operations Center

    Type : Bid Notification

    Due : 02 May, 2024 (Yesterday)
    Posted : 16 days ago
    Started : 01 Apr, 2024 (1 month ago)

    Asbestos may be present in the existing flooring mastic and is present in some pipe insulation, and the City has retained an asbestos abatement contractor to perform any needed pipe insulation abatement work. That abatement work is NOT included in the work under this contract, although the Contractor will be required to coordinate their work with the City’s abatement contractor.

    From: La Crosse (City)

  • Statement of Qualifications for interior renovations of the Wood County Common Pleas Court #1 Administrative Office Area.

    Type : Bid Notification

    Due : 01 May, 2024 (2 days ago)
    Posted : 15 days ago
    Started : 16 Apr, 2024 (17 days ago)

    handlers and pneumatic control valves for judge’s chambers and support staff area and install one new air handler; 5.) demolition of old pipe insulation with install of new pipe insulation to accommodate new air handler location; 6.) installation of new ceiling panels to include grid, tile, LED lights, and return air vents for the HVAC system; 7.) reconfiguration of all lighting in the main office, storage, sitting, and new office areas; 8.) reconfiguration

    From: Wood (County)