Type : Bid Notification
For more information on the project, view the Notice to Bidders by visiting https://il-carpentersville.civicplus.com/DocumentCenter/View/2313/2024-Sanitary-Sewer-Cured-In-Place-Pipe-Lining-Project.
For more information on the project, view the Notice to Bidders by visiting https://il-carpentersville.civicplus.com/DocumentCenter/View/2313/2024-Sanitary-Sewer-Cured-In-Place-Pipe-Lining-Project.
The Project consists of pipe lining using the cured in place pipe (CIPP) method. Base bid efforts shall include all work required for CIPP lining of approximately 2,825 linear feet (LF) of 12-inch pipe, associated needed repair patches, root treatment where necessary, and CCTV recording of approximately 13,350 LF.
lining and installation of a new cement mortar lining on approximately 15,400 linear feet of the 42” Diameter Water Transmission Steel Pipeline, dewatering the pipeline, pipe repairs, final cleaning of entire 430 Pipeline, and traffic control.
Call: 612-428-8778/ Conference ID: 181 549 646# Description: Project Category Code:Traffic Control, Trenchless Utility Construction, Water Transmission Pipelines, Sidewalks/Curbs/Gutters, Bituminous Patching/Coating/Surfacing, Pipe Lining Solicitor Details Solicitor Name:Bolton & Menk, Inc.Design Discipline:ConsultantAddress:2638 Shadow Lane, Suite 200, Chaska, MN - 55318 Phone:952-448-8838Fax:952-448-8805Contact:Matt Bauman, P.E.Email:
Bids will be acted upon by Leyden Township.DESCRIPTION OF WORKThe proposed work is officially known as “George Street Water Main Improvements” and further described as installation of new water main, water services, valve in vaults, and fire hydrants, cured in place pipe lining of sanitary sewer, pavement patching, restoration of parkways, PCC and HMA driveway apron removal and replacement, and epoxy manhole lining all as further described in the
The scope of work includes but is not limited to resurfacing of the roller compacted concrete auxiliary spillway, repair of the outlet control structure concrete surfaces, replacement of the outlet control structure low level gate and appurtenances, cast in place pipe lining of the primary spillway pipe, site grading adjustments, and vegetation clearing.