Type : Bid Notification
Talbert MTA Pipe Realignment Project. No Proposals will be received or considered after that time. The resulting contract from this RFP require the consultant to begin work in January 2023.
Talbert MTA Pipe Realignment Project. No Proposals will be received or considered after that time. The resulting contract from this RFP require the consultant to begin work in January 2023.
Minor pipe realignment is expected or anticipated based on the actual field conditions encountered as the concept plans to be used a guide were based on USACE’s field site visit and coordination with Operation Division personnel.Cotton Hill Campground shall include but not be limited to the following: abandon or remove existing water service lines; install 3/4 inch or 2 inch water service lines with appropriate valves, fittings, couplings, adaptors
The existing pipeline, 24-inch barwrapped concrete cylinder pipe (CCP), includes joint repairs and realignment for two 40-foot pipe sections. Bank stabilization includes rebuilding of the eroded creek bank and installation of rock slope protection. Additionally, work includes flow diversion, tree and debris removal, and all other work for the successful repair and realignment of the pipeline and creek protection against future erosion.
The project includes, but is not limited to, existing 6-in ACP sewer main abandonment in place, relocation & realignment of new 8-inch PVC sewer mains to approximately the center of the street using open trench pipe replacement construction method, sewer lateral extension, realignment & reconnections, sewer manhole installations, existing sewer manhole abandonment, surface restoration, traffic control, mobilization, stormwater control, utility coordination
PORT OF LONGVIEW INVITATION TO BID (ITB) PAPER WAY STORMWATER REALIGNMENT STEEL PIPE AND OTHER MISCELANEOUS MATERIALS PURCHASE PROJECT NO: 20-036.1-ITB PROJECT DESCRIPTION: The Port of Longview (Port) is seeking bids from qualified suppliers for the purchase of steel pipe and other miscellaneous materials to be used in the realignment of the stormwater system at Paper Way. This ITB is for materials only. Materials will be installed by others.
Removal and replacement of curb inlets and storm pipe. Realignment and sealing of manhole frames and covers. Removal and replacement of pavement markings. Pre-Bid Details Date: Time: Location: Notes: Bid Details Date: 2/09/2023 TBA Time: 2:00 PM CST Location: Hawkins City Hall; 200 Bealuah St., Hawkins, TX 75765 Notes: Please submit questions for this project 72 hours prior to bid opening through Civcast Q&A portal.
to be replaced, replacement and realignment of portions of gas header pipes, repair and restoration of existing drainage swales impacted within work area and investigate and repair existing condensate knock-out blockages.