Search results for: pipe realignment

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 23
  • Mt. Talbert MTA Pipe Realignment Project

    Type : Bid Notification

    Due : 07 Dec, 2022 (16 months ago)
    Posted : 17 months ago
    Started : 09 Nov, 2022 (17 months ago)

    Talbert MTA Pipe Realignment Project. No Proposals will be received or considered after that time. The resulting contract from this RFP require the consultant to begin work in January 2023.

    From: Clackamas (County)

  • Water line utility replacement/installation USACE Walter F. George Fort Gaines, GA

    Type : Bid Notification

    Due : 06 Nov, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 31 Oct, 2023 (6 months ago)

    Minor pipe realignment is expected or anticipated based on the actual field conditions encountered as the concept plans to be used a guide were based on USACE’s field site visit and coordination with Operation Division personnel.Cotton Hill Campground shall include but not be limited to the following: abandon or remove existing water service lines; install 3/4 inch or 2 inch water service lines with appropriate valves, fittings, couplings, adaptors

    From: Federal Government (Federal)

  • Felton Diversion Pipeline Emergency Repair Project

    Type : Bid Notification

    Due : 11 Aug, 2023 (8 months ago)
    Posted : 9 months ago
    Started : 29 Jun, 2023 (10 months ago)

    The existing pipeline, 24-inch barwrapped concrete cylinder pipe (CCP), includes joint repairs and realignment for two 40-foot pipe sections. Bank stabilization includes rebuilding of the eroded creek bank and installation of rock slope protection. Additionally, work includes flow diversion, tree and debris removal, and all other work for the successful repair and realignment of the pipeline and creek protection against future erosion.

    From: University of California Santa Cruz (Higher Education)

  • Sewer System Repair Program

    Type : Bid Notification

    Due : 02 Feb, 2023 (15 months ago)
    Posted : 16 months ago
    Started : 20 Dec, 2022 (16 months ago)

    The project includes, but is not limited to, existing 6-in ACP sewer main abandonment in place, relocation & realignment of new 8-inch PVC sewer mains to approximately the center of the street using open trench pipe replacement construction method, sewer lateral extension, realignment & reconnections, sewer manhole installations, existing sewer manhole abandonment, surface restoration, traffic control, mobilization, stormwater control, utility coordination

    From: Los Altos (City)

  • Miscellaneous Materials Purchase, Port of Longview WA

    Type : Bid Notification

    Due : 24 Jul, 2020 (about 3 years ago)
    Posted : about 3 years ago
    Started : 25 Jun, 2020 (about 3 years ago)

    PORT OF LONGVIEW INVITATION TO BID (ITB) PAPER WAY STORMWATER REALIGNMENT STEEL PIPE AND OTHER MISCELANEOUS MATERIALS PURCHASE PROJECT NO: 20-036.1-ITB PROJECT DESCRIPTION: The Port of Longview (Port) is seeking bids from qualified suppliers for the purchase of steel pipe and other miscellaneous materials to be used in the realignment of the stormwater system at Paper Way. This ITB is for materials only. Materials will be installed by others.

    From: Washington State Office of Minority and Women (State)

  • City of Hawkins - Cumbie Street Reconstruction

    Type : Bid Notification

    Due : N/A
    Posted : 15 months ago
    Started : 04 Jan, 2023 (16 months ago)

    Removal and replacement of curb inlets and storm pipe. Realignment and sealing of manhole frames and covers. Removal and replacement of pavement markings. Pre-Bid Details Date: Time: Location: Notes: Bid Details Date: 2/09/2023 TBA Time: 2:00 PM CST Location: Hawkins City Hall; 200 Bealuah St., Hawkins, TX 75765 Notes: Please submit questions for this project 72 hours prior to bid opening through Civcast Q&A portal.

    From: KSA Engineers Inc (Co-op)

  • Bid No. 18-103; Bondi Island Gas Header Repair

    Type : Bid Notification

    Due : 28 Feb, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 31 Jan, 2018 (about 6 years ago)

    to be replaced, replacement and realignment of portions of gas header pipes, repair and restoration of existing drainage swales impacted within work area and investigate and repair existing condensate knock-out blockages.

    From: Massachusetts (State)