Search results for: pipes and associated drainage

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 166
  • Corrugated Steel Pipes and Associated Drainage Products

    Type : Bid Notification

    Due : 04 Feb, 2021 (about 3 years ago)
    Posted : about 3 years ago
    Started : 20 Jan, 2021 (about 3 years ago)

    . **  OC Waste & Recycling is soliciting bids from qualified businesses interested in entering into a firm-fixed price contract for Corrugated Steel Pipes and Associated Drainage Products to be purchased on an as-needed basis.   All questions pertaining to this Invitation for Bid (IFB) must be submitted through the County’s Official Bidding site.

    From: San Jose (City)

  • Corrugated Steel Pipes and Drainage Products

    Type : Bid Notification

    Due : 21 Feb, 2023 (14 months ago)
    Posted : 14 months ago
    Started : 08 Feb, 2023 (14 months ago)

    . ** OC Waste & Recycling is soliciting bids from qualified businesses interested in entering into a firm-fixed price contract for Corrugated Steel Pipes and Associated Drainage Products to be purchased on an as-needed basis. All questions pertaining to this Invitation for Bid (IFB) must be submitted through the County’s Official Bidding site.

    From: San Jose (City)

  • Lara Ave. Drainage Improvements

    Type : Bid Notification

    Due : 02 Apr, 2024 (26 days ago)
    Posted : 1 month ago
    Started : 03 Mar, 2024 (1 month ago)

    Description: Project Owner Number:23-8130Project Category Code:Removal and Replacement of pipe, Sidewalks/Curbs/Gutters, Landscaping - Seeding, DrainageDescription:The project includes replacement of existing drainage pipes along Lara Avenue with 24" x 14" RCPA and 30" x 19" RCPA with associated drainage inlets, installation of curb and gutter, mill and inlay existing surface of Lara avenue, and replacement of driveway cross drains.

    From: McClelland Consulting Engineers (Co-op)

  • Runway 9L-27R Rehabilitation & Taxiway K1 Demolition

    Type : Bid Notification

    Due : 10 May, 2024 (in 11 days)
    Posted : 17 days ago
    Started : 10 Apr, 2024 (19 days ago)

    Bid Schedule A includes the demolition of Taxiway K1; reconstruction of a new blast pad for Runway 9C; construction of paved asphalt shoulder pavement for Taxiway L; replacement and relocation of Runway 9C REILs; removal and reconfiguration of airfield lighting and signage associated with Taxiway K1, K, L, and C; drainage pipe/drainage structure rehabilitation; and grading and drainage improvements necessary to meet FAA requirements.BackgroundIn 2022

    From: Sanford Airport Authority (Airport)

  • Taxiway Charlie Reconstruction Program - Phase 3

    Type : Bid Notification

    Due : 23 May, 2024 (in 24 days)
    Posted : 4 days ago
    Started : 09 Apr, 2024 (19 days ago)

    The removal includes approximately 4,650 SY of concrete pavement, 10,800 SY of asphalt pavement, 1,600 LF of drainage pipe, and the associated drainage structures, existing lighting infrastructure and pavement marking.

    From: Garver (Co-op)

  • T-Hangar Taxiway-Taxilane-Phase 2

    Type : Bid Notification

    Due : 25 Jun, 2017 (about 6 years ago)
    Posted : about 6 years ago
    Started : 31 May, 2013 (about 11 years ago)

    Also included in the project are painted surface markings, turfing around the perimeter of new construction, and also associated drainage to convey runoff via pipes and swales to an existing wet detention pond. The purpose of this construction is to provide aircraft access and staging for future T-Hangars. E-Bidding No Legal Ad Please select either the View or Edit button to manage legal ad.

    From: Hardee (County)

  • Raleigh Blvd Trail Realignment and Relocation Project

    Type : Bid Notification

    Due : 01 Feb, 2023 (15 months ago)
    Posted : 16 months ago
    Started : 03 Jan, 2023 (16 months ago)

    The Project consists generally of the following major items: Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the installation of 2,410 LF of relocated greenway trail and associated storm drainage pipes and removal of 31,360 SF of existing trail (Total 1).

    From: Raleigh (City)