TUBING AND PIPING FOR USCG YARD Solicitation ID/Procurement Identifier: 70Z04023P60342Y00 Ultimate Completion Date: Sat Apr 01 17:00:00 GMT 2023
TUBING AND PIPING FOR USCG YARD Solicitation ID/Procurement Identifier: 70Z04023P60342Y00 Ultimate Completion Date: Sat Apr 01 17:00:00 GMT 2023
Insulation should be snug to piping with no gaps. Brattice cloth should cover the insulation and be coated with Sealfas. Piping to be insulated will vary in size from 1/2 Inch to 4 Inch. The type of insulation to be installed shall be Armaflex AP or equal. The type of jacket to be installed is brattice cloth and Sealfas over the Armaflex insulation. The thickness of the insulation is 3⁄4 Inch (MIL-P-15280).
Insulation should be snug to piping with no gaps. Brattice cloth should cover the insulation and be coated with sealfas. Piping to be insulated will vary in size from 1/4" to 5". The type of insulation to be installed shall be Armaflex AP rubber or equal. Insulation shall be 3/4" thick (MIL-P-15280). Piping installation may not be 100% IAW the drawings so a site survey will be required to insure all pipe sizes and materials needed.
**SHIP TO: USCG YARD PIPE SHOP ATTN USCGC EAGLE WI-33 2401 HAWKINS POINT ROAD RECEIVING ROOM- BUILDING 8 BALTIMORE, MD 21226Preparation For DeliveryAll material must be shipped to U.S. Coast Guard Yard, 2401 Hawkins Point Road, Pipe Shop- BLDG 8, Baltimore, MD, 21226 for this Purchase Order.
Site visit may be waved for vendors who previously installed this chill water insulation on board a 225.Access to the Yard during the rental period is coordinated through the Yard POC. All personnel shall receive visitor’s passes and clearance from USCG Coast Guard Yard Security located at the Main Gate. List of personnel requiring access shall be provided to the Yard POC twenty-four (24) hours prior to requiring access.
The Contractor shall complete all work in accordance with the Contract Documents and the Federal, State, and local regulatory permits received for the project (Appendix A of the Specifications).The total estimated amount of material to be removed from the channel is 8,700 cubic yards of silt, mud, sand, gravel, and cobbles.
Coast Guard, Surface Forces Logistics Center (SFLC) intends to award a Firm Fixed Price Purchase Order.The Coast Guard Yard will only be providing site surveys the week of October 3rd though October 7th 2022.