Search results for: piping thickness

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 57
  • Tank System and Associated Piping Thickness and Tightness Testing

    Type : Bid Notification

    Due : 24 Apr, 2018 (about 6 years ago)
    Posted : about 6 years ago
    Started : 13 Apr, 2018 (about 6 years ago)

    Added:Mar 12, 2018 1:59 pm COMBINED SYNOPSIS/SOLICITATIONW91ZLK-18-R-0006TANK SYSTEM AND ASSOCIATED PIPING THICKNESS AND TIGHTNESS TESTINGThis combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice.

    From: Federal Government (Federal)

  • Tank System And Associated Piping Thickness And Tightness Testing at the CTF and MAPS Facilities

    Type : Bid Notification

    Due : 07 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 01 Feb, 2022 (about 2 years ago)

    The objective of this contract is to conduct thickness and tightness testing on the Chemical Transfer Facility (CTF) storage tanks and piping, conduct formal external inspections of the tanks, a formal visual inspection and hydrostatic testing of the piping system at the Munitions Assessment And Processing System (MAPS), and received the resulting reports.

    From: Federal Government (Federal)

  • Visual and Ultrasonic Thickness Inspection of Anhydrous Ammonia Piping System, to Include Valves NDT Inspection - WTEF (Does Not Include Tank)

    Type : Bid Notification

    Due : 18 Sep, 2023 (7 months ago)
    Posted : 10 months ago
    Started : 19 Jun, 2023 (10 months ago)

    Geiger Blvd, Spokane WA 99224, to provide services comprised of a comprehensive, visual and ultrasonic thickness inspection of Anhydrous Ammonia PSM Piping System, to include Valves via NDT Inspection, and provide report; all of which would need to be conducted within five-calendar days. MANDATORY Pre Bid Site Visit.

    From: Spokane (City)

  • Rock Island County Health Department to Purchase and Install a LIEBERT PDX THERMAL MANAGEMENT SYSTEM

    Type : Bid Notification

    Due : 31 Aug, 2022 (20 months ago)
    Posted : 20 months ago
    Started : 16 Aug, 2022 (20 months ago)

    Piping to include; service isolation valves at the air handlers, moisture indicators, and liquid line filters. All piping to be ACR copper thickness. 9) Pull a vacuum and charge the units with r-410a refrigerant. 10) Insulate the new refrigerant piping with 1⁄2” wall thickness Armaflex insulation. 11) Connect the new condensers to the existing electrical power wiring at their respective locations.

    From: Rock Island (County)

  • Digester Gas Piping Rehabilitation Project

    Type : Bid Notification

    Due : 19 Dec, 2023 (4 months ago)
    Posted : 4 months ago
    Started : 01 Dec, 2023 (5 months ago)

    The project consists of the following scope items: • Replacing two 12-inch digester gas header piping segments and two condensate drain lines within a confined space (Gas Vault). • Purge, configure, operate and maintain bypass piping to allow piping demolition and replacement. • Prior to replacement of the digester gas piping, Contractor shall conduct an ultrasonic thickness test survey of the exposed digester gas piping from individual digesters

    From: University of California Santa Cruz (Higher Education)

  • CGC Confidence LUBE OIL Piping Repair

    Type : Bid Notification

    Due : 26 Feb, 2024 (2 months ago)
    Posted : 2 months ago
    Started : 16 Feb, 2024 (2 months ago)

    Due to heavy corrosion on piping in the vicinity of the hole, piping needs to be cut out and replaced. Hole in piping is located inboard side of NR1 MDE, approximately 1’ aft of frame 114, and approximately 1’ below the deck plate level.

    From: Federal Government (Federal)

  • Exhaust Insulation Services

    Type : Bid Notification

    Due : 01 Feb, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 12 Jan, 2022 (about 2 years ago)

    F, Insulation Thickness 4”.MDE: operating temp approx. 900 deg. F, Insulation Thickness 4-1/2”.External surface temperature for exhaust piping shall not exceed 125 F to 135 FA site survey is required for the bidding process.Place of Performance and Site Location:United States Coast Guard Yard2401 Hawkins Point Rd.Baltimore, MD 21226

    From: Federal Government (Federal)