  • Foundation Construction - Gap Canyon Pkwy Transmission Line

    Type : Bid Notification

    Due : 21 Dec, 2022 (16 months ago)
    Posted : 16 months ago
    Started : 01 Dec, 2022 (16 months ago)

    \n\nThe BID includes the following: Excavation, earthwork, and installation of concrete foundations for\nthe Gap Canyon Pkwy Transmission Line.\n\nAll BIDDERS who submit a BID are required to be on the Plan Holders List. Addenda will only be\nprovided to the plan holders that are on the Plan Holders List.

    From: St. George (City)

  • Water Transmission / American Plaza to Exchange Pkwy, Phase 1

    Type : Bid Notification

    Due : 26 Jan, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 27 Dec, 2023 (3 months ago)

    Bid Details Planholder Water Transmission / American Plaza to Exchange Pkwy, Phase 1 Active Browse Awarded Bids Download Bid Package Bid Details Agency Name City of Waco Bid Writer Melanie Wade Bid ID RFB-RFB 2023-089-0-2024/MW Bid Type RFB - Request for Bid Broadcast Date 12/27/2023 10:37 AM Central Fiscal Year 2024 Due Date 01/26/2024 2:00 PM Central Bid Status Text None Additional Registration (NEW) NONE Scope of Work Construction of the American

    From: City of Waco (City)

  • Water Transmission / American Plaza to Exchange Pkwy., Phase 1

    Type : Bid Notification

    Due : 26 Jan, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 01 Jan, 2023 (15 months ago)

    Construction of the American Plaza to Exchange Parkway WaterTransmission Line Improvements, Phase 1 Project to generally consist of but notlimited to all labor, materials, equipment, appurtenances and incidentals as requiredto properly install, complete and be accepted in place approximately 3,500 linearfeet of 24-inch C-900 DR 18 PVC waterline, a 215 linear foot bore using a 36-inchductile iron pipe for a Union Pacific Railroad, and all associated pipe andmiscellaneous work as identified in the construction documents, and all labor,equipment, and materials complete and in place as stated in RFB and shown on theplans.

    From: Texas (State)

  • RFB 2023-089 Water Transmission / American Plaza to Exchange Pkwy., Phase 1

    Type : Bid Notification

    Due : 26 Jan, 2024 (2 months ago)
    Posted : 3 months ago
    Started : 11 Jan, 2024 (3 months ago)

    Construction of the American Plaza to Exchange Parkway Water Transmission Line Improvements, Phase 1 Project to generally consist of but not limited to all labor, materials, equipment, appurtenances and incidentals as required to properly install, complete and be accepted in place approximately 3,500 linear feet of 24-inch C-900 DR 18 PVC waterline, a 215 linear foot bore using a 36-inch ductile iron pipe for a Union Pacific Railroad, and all associated

    From: Waco (City)

  • 49--TRANSFORMER OIL LEAK REPAIRS AT FT THOMPSON AND GR

    Type : Award

    Due : N/A
    Posted : about 6 years ago
    Started : 14 May, 2018 (about 6 years ago)

    TRANSFORMER OIL LEAK REPAIRS AT FT THOMPSON AND GRAND ISLAND SUBSTATIONS Contact Information: Kostel, Dana Dilynn Office Address :WAPA (UGP)US DOE/WESTERN AREA POWER200 4th STREET SWHURONSD57350-2474USLocation: All DOE Federal Contracting Offices Set Aside: Award Number: 89503418PWA000175 Award Amount : $56,117.00 Award Date: 051418 Awardee: TRANSMISSION AND DISTRIBUTION SERVICES, LLC28369 DAVIS PKWY STE 401WARRENVILLEIL605553036USAIL

    From: Federal Government (Federal)

  • 100361 - SW TUALATIN-SHERWOOD ROAD SW LANGER FARMS PKWY TO SW TETON AVE AND PLM_4.2 - 66" WATER TRANSMISSION PIPELINE

    Type : Bid Notification

    Due : 20 Apr, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 21 Mar, 2022 (about 2 years ago)

    1. Preface1. IntroductionWork shall comply with the following standards which are hereby incorporated into these bid documents by reference:2018 edition of the "Oregon Standard Specifications for Construction" Oregon Department of Transportation (ODOT), Oregon Chapter of American Public Works Association (APWA), as modified by these Special Provisions or Addenda.Other standards identified in these Bid Documents by reference.The Contractor may view or purchase copies of the 2018 edition of the "Oregon Standard Specifications for Construction" from the Oregon Department of Transportation website: http://www.oregon.gov/ODOT/Busine...

    From: Washington County (County)

  • RFB for Tubular Steel Structures

    Type : Bid Notification

    Due : 27 Jan, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 12 Jan, 2022 (about 2 years ago)

    Pleasant - Sugg Pkwy Transmission 19 Structure # Pole Height (ft.)

    From: Greenville Utilities (Utilities)