Search results for: plans and weather

Refine your Search
Apply several filters to get precise search results
Showing opportunity 1 - 10 of 13,658
  • CONSULTING SERVICES RELATING TO ELECTRIC EMERGENCY OPERATIONS PLANS AND WEATHER EMERGENCY PREPAREDNE

    Type : Bid Notification

    Due : 11 Jan, 2022 (about 2 years ago)
    Posted : about 2 years ago
    Started : 29 Nov, 2021 (about 2 years ago)

    ; analyze and advise the Commission on the ability of the electric grid to withstand extreme weather; and make recommendations on improving emergency operations plans and procedures in order to ensure the continuity of electric service.Senate Bill 3 approved during the 87th legislative session in 2021 amended Texas Utilities Code § 186.007 and now requires the PUCT to assess emergency operations plans and submit weather emergency preparedness reports

    From: Texas (State)

  • SERVICES RELATING TO ELECTRIC EMERGENCY OPERATIONS PLANS AND WEATHER EMERGENCY PREPAREDNESS REPORTS

    Type : Bid Notification

    Due : 20 Nov, 2023 (5 months ago)
    Posted : 6 months ago
    Started : 01 Jan, 2023 (16 months ago)

    The Public Utility Commission of Texas (PUCT) is seeking the services of a contractor to review over 700 emergency operations plans filed by Texas electric utilities, power generation companies, municipally owned utilities, electric cooperatives, and retail electric providers (collectively Texas electric enti ties); analyze and advise the Commission on the ability of the electric grid to withstand extreme weather in the power regions outside of the

    From: Texas (State)

  • Lake County Affordable Housing Developer

    Type : Bid Notification

    Due : 06 May, 2024 (Tomorrow)
    Posted : 14 days ago
    Started : 19 Apr, 2024 (15 days ago)

    The selected builder or developer will be working with the project manager, MY Rural Planner (MYRP), to ensure building plans and all required permits, entitlements, plans, utilities, and foundation subgrades are ready for the developer to begin once the weather permits in 2025.See more info in three attached documents.

    From: Lake (County)

  • IFB#3275-24 - Bob Hall Pier Reconstruction

    Type : Bid Notification

    Due : 09 May, 2024 (in 3 days)
    Posted : 27 days ago
    Started : 23 Mar, 2024 (1 month ago)

    Existing Pavilion Rehabilitation The contractor is responsible for the rehabilitation of the existing Pavilion including limited demolition, replacements of fixtures, cleaning, painting, and other repairs, in accordance with the plans and specifications. 4. NOAA Station The contractor is responsible for the construction of the NOAA weather station in accordance with plans developed by Jacobs Engineering Group.

    From: Nueces (County)

  • Priscilla R. Tyson Cultural Arts Center Exterior Imp

    Type : Bid Notification

    Due : 21 May, 2024 (in 16 days)
    Posted : 1 day ago
    Started : 18 Apr, 2024 (16 days ago)

    The time between 12/31/2024 and 3/31/2024 will be for weather dependent punch list items. Questions pertaining to the drawings, plans, specifications, IFB, and/or other contract documents must be submitted in writing to the Department of Recreation & Parks by email to Jamie Schlichting, JPSchlichting@columbus.gov, through May 14th, 2024. No phone calls will be accepted.

    From: Columbus (City)

  • WET WEATHER EQUALIZATION BASIN PROJECT

    Type : Bid Notification

    Due : 27 Apr, 2017 (about 7 years ago)
    Posted : about 7 years ago
    Started : 22 Mar, 2017 (about 7 years ago)

    Detail View WET WEATHER EQUALIZATION BASIN PROJECT SEALED BIDS will be received by the City Clerk, or designee, of the City of Pacifica for the Project identified above until Thursday, April 27, 2017, at 2:00 p.m. Bids shall be sealed and addressed and noted as follows:City ClerkCity of Pacifica170 Santa Maria AvenuePacifica, CA 94044NOTE: Project Plans and Specifications are available electronically through BarkerBlue.

    From: Pacifica (City)

  • Self Locating Datum Marker Buoy (SLDMB)

    Type : Bid Notification

    Due : 21 May, 2024 (in 16 days)
    Posted : 3 days ago
    Started : 01 May, 2024 (3 days ago)

    The marker buoy must be capable of operating in heavy/inclement weather such as high winds, waves, storms, and icing conditions and in both salt and fresh water. The oceanographic marker buoy, drift with the upper one meter of the ocean, minimizing slippage with the water and rectification of the wave motions. Once deployed the marker buoy sink at the end of their life cycle and are expendable.The U.S.

    From: Federal Government (Federal)